Question 56

A consultant is working to setup the network before starting the Foundation process.

How should the consultant complete this task?

Options:

A.

Using the shared IPMI port, ensure that the connected switch can auto-negotiate to 1 Gbps.

B.

Disable IPv6 on the network to which the nodes are connected to ensure that IPv6 unicast is blocked.

C.

Ensure the IPMI of the nodes are reachable using pre-configured IPMI IPv6 addresses.

D.

On Nutanix NX Series, connect the IPMI port and any one of the data ports to the switch.

Question 57

Where in the Support Portal is the Best Practices guide for vSphere Networking located?

Options:

A.

Product Notices

B.

Solutions Documentation

C.

Software Documentation

D.

Knowledge Base

Question 58

A consultant creates a Nutanix cluster using the 10.10.10.0/24 network and VLAN 10. The customer creates a VM network inside the Prism using VLAN 20. The customer starts to create VMs but is unable to ping the default gateway from these new systems.

What is causing the issue?

Options:

A.

The CVM/hypervisor must be on an untagged VLAN.

B.

The switch port is not set up as a trunk.

C.

Only one VLAN is supported on AHV.

D.

The CVM/hypervisor cannot use the same VLAN as guest VMs.

Question 59

A consultant is completing final network failover testing on a recently deployed AHV cluster.

The cluster consists of the following:

•Three nodes

•Two uplinks connected to two switches

•Supported SFPs

The consultant removed one SFP+ out of each node. Two of the nodes (Hostl I Host2) failed over to the backup NIC correctly without any interruption but have lost communication with the third node (Host 3) hypervisor/CVM. Inserting the original SFP+ back into the problematic node allowed the network to be connected and the two healthy nodes could communicate successfully again.

manage_ovs showjnterfaces output

manage_ovs showjinterfaces output:

name mode link speed

cthO 10000 True 10000

ethl 10000 False None

eth2 10000 True 10000

eth3 10000 False None

manage_ovs show.uplinks output:

Bridge: brO

Bond: brO-up

bond_mode: active-backup

interfaces: ethl ethO

lacp: off

lacp-fa I 1 back: false

lacp_speed: slow

What should the consultant validate first?

Options:

A.

Validate NIC card on node is seated properly.

B.

Validate that the correct interfaces are included in the bridge.

C.

Validate the customer has configured all their switch ports identically.

D.

Validate the SFP+ is fully plugged into the node and switch.

Page: 14 / 22
Exam Code: NCS-Core
Exam Name: Nutanix Certified Services Core Infrastructure Professional
Last Update: Dec 23, 2024
Questions: 302
NCS-Core pdf

NCS-Core PDF

$25.5  $84.99
NCS-Core Engine

NCS-Core Testing Engine

$28.5  $94.99
NCS-Core PDF + Engine

NCS-Core PDF + Testing Engine

$40.5  $134.99