Winter Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: bigdisc65

CTFL-PT_D Premium Exam Questions

Page: 2 / 2
Question 8

Identify the activity that is NOT part of the performance test preparation.

SELECT ONE OPTION

Options:

A.

Deploying the environment.

B.

Setting up the system under test.

C.

Setting up the load generation and monitoring tools and making sure that all the necessary information will be collected.

D.

Virtualizing the servers.

Question 9

In this question, consider that test scripts are generated from a protocol level recording. At the end of the recording, an attempt was made to execute the recorded scripts without any processing, and it was not possible to play them back.

Question

What could be the reason why it is not possible to play back the script?

SELECT ONE OPTION

Options:

A.

The lack of business logic.

B.

The test script has not been correlated.

C.

The length of the script.

D.

The missing Initialization section.

Question 10

Which elements are the MOST important parts of a performance testing environment?

1.Test scripts.

2.Software configuration.

3.Test data.

4.The type of environment (physical, cloud-based, virtualized).

5.Hardware configuration.

SELECT ONE OPTION

D. II, V are the most important parts of the test environment.

Options:

A.

III,V are the most important parts of the test environment.

B.

II.IV are the most important parts of the test environment.

C.

II.III. V are the most important parts of the test environment.

Question 11

Which of following statements (listed I. to V.) are TRUE in characterizing result verification and error handling in a performance test script?

1.It is not necessary to verify that the script Is doing what It is supposed to do using Indirect methods, such as a database check.

2.The scripts should always include logical rules.

3.Manual intervention may be required to carry out remedial action in the event of an error.

4.Performance scripts should be subject to quality control and testing, just like any software product.

5.The default error handling of the performance test tools Is sufficient, so no additional checks need to be introduced.

SELECT ONE OPTION

Options:

A.

True statements: II, IV.

B.

True statements: 111, V.

C.

True statements: III, IV.

D.

True statements: I, IV.

Page: 2 / 2
CTFL-PT_D Premium Exam Questions,
Exam Code: CTFL-PT_D
Exam Name: ISTQB Certified Tester Foundation Level - Specialist Performance Testing
Last Update: Nov 7, 2024
Questions: 0
CTFL-PT_D pdf

CTFL-PT_D PDF

$28  $80
CTFL-PT_D Engine

CTFL-PT_D Testing Engine

$33.25  $95
CTFL-PT_D PDF + Engine

CTFL-PT_D PDF + Testing Engine

$297.5  $850