Weekend Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: Board70

CTFL-PT_D Exam Dumps - iSQI ISQI certification Questions and Answers

Question # 4

(REFER TO BASE SCENARIO 2): When you refer to Base Scenario 2, you are referring to the description and only the description, without any modification.

Question specific constraints: (specific constraints are not part of the Base Scenario and are specific to this question).

Throughout the month of January (31 days), the company performed 3,100 departure operations from the Capital City Airport. These departure operations transported 465,000 passengers during the hours of operation, from 07:00 to 23:00.

The departing passengers (one of the most relevant operational profiles) will access the front-end of the application to check in for their flight. It is known that 30% of departing passengers reconnect after checking in to request the boarding pass to be resent or printed.

Question

How many departing passengers access the front-end per hour?

SELECT ONE OPTION

Options:

A.

625.00 departing passengers / hour.

B.

1,425.00 departing passengers / hour

C.

1,700 00 departing passengers / hour.

D.

812.50 departing passengers / hour.

Buy Now
Question # 5

Which of following statements (listed I. to V.) are TRUE in characterizing result verification and error handling in a performance test script?

1.It is not necessary to verify that the script Is doing what It is supposed to do using Indirect methods, such as a database check.

2.The scripts should always include logical rules.

3.Manual intervention may be required to carry out remedial action in the event of an error.

4.Performance scripts should be subject to quality control and testing, just like any software product.

5.The default error handling of the performance test tools Is sufficient, so no additional checks need to be introduced.

SELECT ONE OPTION

Options:

A.

True statements: II, IV.

B.

True statements: 111, V.

C.

True statements: III, IV.

D.

True statements: I, IV.

Buy Now
Question # 6

Which elements are the MOST important parts of a performance testing environment?

1.Test scripts.

2.Software configuration.

3.Test data.

4.The type of environment (physical, cloud-based, virtualized).

5.Hardware configuration.

SELECT ONE OPTION

D. II, V are the most important parts of the test environment.

Options:

A.

III,V are the most important parts of the test environment.

B.

II.IV are the most important parts of the test environment.

C.

II.III. V are the most important parts of the test environment.

Buy Now
Question # 7

In this question, consider that test scripts are generated from a protocol level recording. At the end of the recording, an attempt was made to execute the recorded scripts without any processing, and it was not possible to play them back.

Question

What could be the reason why it is not possible to play back the script?

SELECT ONE OPTION

Options:

A.

The lack of business logic.

B.

The test script has not been correlated.

C.

The length of the script.

D.

The missing Initialization section.

Buy Now
Question # 8

Identify the activity that is NOT part of the performance test preparation.

SELECT ONE OPTION

Options:

A.

Deploying the environment.

B.

Setting up the system under test.

C.

Setting up the load generation and monitoring tools and making sure that all the necessary information will be collected.

D.

Virtualizing the servers.

Buy Now
Question # 9

What is the benefit of transaction nesting for performance testing?

SELECT ONE OPTION

Options:

A.

The possibility to measure the evolution of response time with the load.

B.

The ability to measure individual and aggregate activities.

C.

The possibility to measure the time elapsed for the transaction.

D.

The ability to measure reflection time to better represent when a real user performs an action.

Buy Now
Question # 10

(REFER TO BASE SCENARIO 2): When you refer to Base Scenario 2. you are referring to the description and only the description, without any modification.

Question specific constraints: (specific constraints are not part of the Base Scenario and are specific to this question).

Natalie has run a performance test cycle. The following metrics have been collected:

Total virtual users: 10,000.

•Status of the simulated users.

o Total number of users for whom all transactions have been completed: 89%.

•Transaction response time, o Check-in

■Response time < 1 second: 60%

■Response time < 2 seconds: 70%

■Response time < 3 seconds: 88%

■Response time < 5 seconds: 90%

■Response time < 10 seconds: 95%

Question

Given this information, how should Natalie present the results to those involved?

SELECT ONE OPTION

Options:

A.

The percentage of completed transactions is so close to the acceptance value that no improvement is required. The transactions associated with the check-in are below the acceptance value, a minimum improvement is required.

B.

The percentage of completed transactions is close to the acceptance value, an improvement is required. The transactions associated with the check-in are close to the acceptance value, no Improvement is required.

C.

The percentage of completed transactions is close to the acceptance value, no improvement is required. The transactions associated with the check-in are below the acceptance value, no improvement is required.

D.

The percentage of completed transactions is close to the acceptance value, an improvement is required. The transactions associated with the check in are below the acceptance value, an improvement is required.

Buy Now
Question # 11

ich ONE of the following options is a specific performance risk in mobile applications?

ONE OPTION

Options:

A.

Network congestion.

B.

Slow data flow from sensors.

C.

Limited resources.

D.

Inefficient Implementation of algorithms.

Buy Now
Question # 12

What are the main activities of performance test execution?

1.Monitoring all parts of the environment.

2.Setting up the load generation and monitoring tools.

3.Collecting and keeping all results and information related to the test.

4.Generation of a load against the SUT according to a load profile.

5.Parameterize the test scripts.

6.Setting up the system under test.

SELECT ONE OPTION

Options:

A.

The following are performance test activities: III, IV.

B.

The following are performance test activities: I, III. IV.

C.

The following are performance test activities: I. V, VI.

D.

The following are performance test activities: I, III, VI.

Buy Now
Question # 13

(REFER TO BASE SCENARIO 2): When you refer to Base Scenario 2, you are referring to the description and only the description, without any modification.

Question specific constraints: (specific constraints are not part of the Base Scenario and are specific to this question).

• Natalie should make a presentation to the technical stakeholders In order to explain the performance test plan.

Question

Which ONE of the following options contains information that should be included in Natalie's presentation to the technical stakeholders?

SELECT ONE OPTION

Options:

A.

A spike test shall be conducted in a test environment equivalent to the production environment. Passengers shall be removed from the production environment, disassociated and Imported into the test environment.

B.

A spike test shall be conducted in the performance test environment set up by the systems manager. Preparation includes installation from the clone of the virtual machine identified for this purpose.

C.

The cost of the spike test will be In line with the budget submitted by the cloud service provider. The test must take place within the planned timeframe and use the disassociation algorithm previously agreed.

D.

A performance test will be conducted to verify the management application s capability to support simultaneous, i.e. concurrent, request peaks. The objective is to check that the system will be able to support the operations.

Buy Now
Exam Code: CTFL-PT_D
Exam Name: ISTQB Certified Tester Foundation Level - Specialist Performance Testing
Last Update: Feb 23, 2025
Questions: 0
CTFL-PT_D pdf

CTFL-PT_D PDF

$25.5  $84.99
CTFL-PT_D Engine

CTFL-PT_D Testing Engine

$28.5  $94.99
CTFL-PT_D PDF + Engine

CTFL-PT_D PDF + Testing Engine

$255  $850