Question 20

In order two support a new application, you are planning to add a RAC VM cluster to an existing Oracle Exadata X9M-2 deployment.

Which two methods can be considered?

Options:

A.

Use Oracle VM Manager.

B.

Use the OEDA web-based configuration tool.

C.

Use domu_maker utility.

D.

Use the xm command.

E.

Use the OEDA Command line interface.

Question 21

Which four actions should you take before proceeding with applying updates to your Exadata Database Machine?

Options:

A.

Consult My Oracle Support note 888828.1 to determine the current recommended Exadata software release.

B.

Check the Exadata Critical Issues My Oracle Support note 1270094.1 for any issues not added to the latest version of exachk.

C.

Run exachk and resolve only WARNINGS that you have not seen before.

D.

Run the appropriate patchmgr preqequisite check step for each component being updated.

E.

Run patchmgr --all_comp —autofix —autobackup —upgrade —rolling.

F.

For database servers, perform a server backup using patchmgr —dbnodes db_list_file —backup —rolling.

Question 22

For which four component failures on an X9M Database Machine does Auto Service Request (ASR) raise service requests?

Options:

A.

RoCE network interface cards in the storage servers

B.

fans in the storage servers

C.

Cisco RDMA over Converged Ethernet (RoCE) switches

D.

RoCE network interface cards in the database servers

E.

power distribution units

F.

Cisco management switch

G.

power supplies in the database servers

Question 23

An Exadata X9M-2 Elastic Rack with 4 Database Servers and 8 HC Storage Servers and 3-phase 24kVA PDUs is being installed in a Data Center. However, the Data Center is only providing enough power for a single cable from each PDU. Which statement is correct?

Options:

A.

A splitter cable can be used to provide power to all PDU cables.

B.

The power cables from the servers to the PDUs can be rearranged inside the rack following OECA guidance to utilize a single PDU power cable.

C.

The installation cannot proceed until two power feeds are available per PDU.

D.

The installation can go ahead, no change is required.

Page: 5 / 6
Exam Code: 1z0-902
Exam Name: Oracle Exadata Database Machine X9M Implementation Essentials
Last Update: Nov 21, 2024
Questions: 85