Weekend Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: Board70

CQE Exam Dumps - ASQ certification Questions and Answers

Question # 14

In a value stream analysis, inspection is typically classified as

Options:

A.

real value added

B.

organizational value added

C.

non-value added

D.

customer value added

Buy Now
Question # 15

When subgroups are selected in a way that minimizes the opportunity for variation within a subgroup and maximizes the opportunity to detect variation between subgroups, this subgrouping is known as

Options:

A.

random

B.

assignable

C.

controlled

D.

rational

Buy Now
Question # 16

When requesting "worst case" design analysis, you expect the reliability group to

Options:

A.

Analyze the worst rejects.

B.

Analyze only those products failing to meet specification requirements.

C.

Determine whether product requirements can be met with subassemblies assumed at their worst combination of tolerances.

D.

Assume all subassembly tolerances at their maximum limit.

Buy Now
Question # 17

The primary focus of design FMEA (DFMEA) is to

Options:

A.

identify personnel responsible for implementation

B.

predict failure frequencies

C.

minimize measurement variation

D.

mitigate failure modes

Buy Now
Question # 18

A company's quality policy should be developed by the

Options:

A.

executive level of management

B.

manager of quality

C.

most productive process improvement team

D.

quality engineering department

Buy Now
Question # 19

A system was designed with 3 capacitors. When the system is first activated all capacitors are operating. The system continues to operate as long as at least 1 capacitor is operating. This is an example of

Options:

A.

Redundancy.

B.

A series system.

C.

An active parallel system.

D.

A standby parallel system.

Buy Now
Question # 20

The following chart is being used to monitor a process. What do points X and Y. and region Z

represent on the chart?

Options:

A.

Special causes of variation

B.

Changes in raw materials

C.

Common causes of variation

D.

Statistically stable variation

Buy Now
Question # 21

A company uses four components (W. X. Y. and Z) to create its final product. The source and time factors for these components are listed below. What is die critical path for this company's final product?

ComponentSourceAcquisition TimeInstallation TimePredecessor Steps

WInternaln/a4 weeksNone

XExternal5 weeks4 weeksNone

YInternaln/a4 weeksW.X.Z

ZInternaln/a6 weeksNone

Options:

A.

6 weeks

B.

8 weeks

C.

9 weeks

D.

13 weeks

Buy Now
Question # 22

Maintainability is

Options:

A.

The probability of a system being restored to functional operation within a given period of time.

B.

Performing adequate maintenance on a system.

C.

Probability of survival of a system for a given period of time.

D.

Maintaining a machine in satisfactory working condition.

Buy Now
Question # 23

During the causes of a problem have been verified in the analysis phase of a six sigma project, they will form the basis of the solution in Much of the following phases?

Options:

A.

Control

B.

Define

C.

Improve

D.

Measure

Buy Now
Exam Code: CQE
Exam Name: Certified Quality EngineerExam
Last Update: Feb 23, 2025
Questions: 175
CQE pdf

CQE PDF

$25.5  $84.99
CQE Engine

CQE Testing Engine

$28.5  $94.99
CQE PDF + Engine

CQE PDF + Testing Engine

$40.5  $134.99