Question # 24

Who has primary responsibility for determining the purpose and scope of an audit?

Options:

A.

Client

B.

Auditee

C.

Auditor

D.

Audit manager

Buy Now
Question # 25

80° o of weekly inspection non-conforming reports presented to the material review board (MRB) at Marathon Manufacturing Co. end up not being dispositioned for corrective action. Project management developed a risk management plan which included a standard repair manual (SRM) to help mitigate these issues. Only conditions that exceed SRM requirements or specifications will now be forwarded for MRB review. A week after releasing the SRM. the quality engineering team decided to generate and distribute weekly alert reports of non-conformities that exceed SRM requirements or specifications to all inspectors. They also instructed all employees involved in the creation of those discrepancies be re-trained.

Which of the following processes may be considered a risk treatment?

Options:

A.

Generating a weekly report of non-conformities that exceed SRM requirement and specifications

B.

Distributing weekly alert report of non-conformities to all inspectors

C.

Instructing that all employees involved creating those discrepancies be re-trained

D.

Reducing throughput at Marathon Manufacturing Co.

Buy Now
Question # 26

Which of the following statements BEST describes a bimodal distribution?

Options:

A.

This distribution shows stratified data and two distinct peaks.

B.

This distribution shows a single mode and bell shaped distribution.

C.

This distribution is truncated.

D.

This distribution has several distribution peaks.

Buy Now
Question # 27

The risk priority number (RPN) is determined by the

Options:

A.

sum of reliability value, criticality number, and failure mode

B.

sum of frequency of the occurrence, severity, and detection ratings

C.

product of reliability value, criticality number, and failure mode

D.

product of frequency of the occurrence, severity, and detection ratings

Buy Now
Question # 28

An increase in the overall length of a recently qualified metal component has been observed and the quality engineer suspects that the storage temperature could be a factor that has affected the overall length. Which of the following tools could be used to assess this relationship?

Options:

A.

Affinity diagram

B.

Scatter diagram

C.

Histogram

D.

Cause and effect diagram

Buy Now
Question # 29

Which of the following is the most important aspect of a successful quality improvement effort?

Options:

A.

Employee participation

B.

Financial comminnent

C.

Management commitment

D.

Organizational need

Buy Now
Question # 30

Which of the following techniques is used when implementing single minute exchange of die?

Options:

A.

Using more fasteners and clamps

B.

Eliminating the use of intermediate jigs

C.

Separating internal and external setup operations

D.

Adjusting and eliminating mechanization

Buy Now
Question # 31

A company is developing a machine that has many modules. Each module works as intended, but when placed in the machine the system performs at less than desired levels. System changes have further optimized each module, but overall system optimization has continued to decline. This is an example of

Options:

A.

a feasibility study

B.

a SWOT analysis

C.

a PEST analysis

D.

an unintended consequence

Buy Now
Question # 32

A production line has job aids that outline, step by step, how to perform the tasks of the job. This is followed by each of the operators working on the line. This is an example of

Options:

A.

take time

B.

5S

C.

standardized work

D.

value stream mapping

Buy Now
Question # 33

Which of the following activities assesses the maturity of product or system design?

Options:

A.

Critical design review

B.

Preliminary design

C.

System requirement

D.

Production readiness system

Buy Now
Exam Code: CQE
Exam Name: Certified Quality EngineerExam
Last Update: Feb 23, 2025
Questions: 175
CQE pdf

CQE PDF

$25.5  $84.99
CQE Engine

CQE Testing Engine

$28.5  $94.99
CQE PDF + Engine

CQE PDF + Testing Engine

$40.5  $134.99