Who has primary responsibility for determining the purpose and scope of an audit?
80° o of weekly inspection non-conforming reports presented to the material review board (MRB) at Marathon Manufacturing Co. end up not being dispositioned for corrective action. Project management developed a risk management plan which included a standard repair manual (SRM) to help mitigate these issues. Only conditions that exceed SRM requirements or specifications will now be forwarded for MRB review. A week after releasing the SRM. the quality engineering team decided to generate and distribute weekly alert reports of non-conformities that exceed SRM requirements or specifications to all inspectors. They also instructed all employees involved in the creation of those discrepancies be re-trained.
Which of the following processes may be considered a risk treatment?
An increase in the overall length of a recently qualified metal component has been observed and the quality engineer suspects that the storage temperature could be a factor that has affected the overall length. Which of the following tools could be used to assess this relationship?
Which of the following is the most important aspect of a successful quality improvement effort?
Which of the following techniques is used when implementing single minute exchange of die?
A company is developing a machine that has many modules. Each module works as intended, but when placed in the machine the system performs at less than desired levels. System changes have further optimized each module, but overall system optimization has continued to decline. This is an example of
A production line has job aids that outline, step by step, how to perform the tasks of the job. This is followed by each of the operators working on the line. This is an example of
Which of the following activities assesses the maturity of product or system design?