Question # 14

According to a manager it takes an average weekday commute of 39 minutes with a Standard Deviation of 7 minutes for the employees to get to work while they use their personal vehicles for their office commute while the management set a policy of not more than 40 minutes for their daily one-way commute. A survey conducted one day on 70 employees showed an average of 34 minutes commuting time using the metro public transportation system with a Standard Deviation of 21 minutes. If the Standard Deviation is uncontrollable then the other option to increase the probability of coming in on time via personal vehicles to work could be ____________?

Options:

A.

Increase the average time of commute

B.

Maintain the average time of commute and change route to work

C.

Reduce average commute time to work by departing earlier

D.

Change policy at work and request for flexible times based on location

Buy Now
Question # 15

The difference between the largest observation and the smallest observation in the data set is known as the _______________.

Options:

A.

Breadth

B.

Range

C.

Spread

D.

Median

Buy Now
Question # 16

Some of the approaches used in Lean include station warning lights, tool boards and jidohka devices in order that which of these apply?

Options:

A.

Workers do not utilize individual methods of cleaning

B.

Problems are made highly visible

C.

Work stoppages are documented properly

D.

Lessen the amount of employee pilferage

Buy Now
Question # 17

According to the definition of Rolled Throughput Yield which of these items best describe the purpose of RTY?

Options:

A.

A function of Y=f(x)

B.

Accounts for losses due to rework and scrap

C.

Isolates the increase throughput

D.

Determines incremental Growth

Buy Now
Question # 18

Which element of waste best describes "the cost of an idle resource"?

Options:

A.

Waiting

B.

Motion

C.

Inventory

D.

Correction

Buy Now
Question # 19

When two Inputs have an impact on the Output together yet seem to have no or little impact on their own this is called a/an ________________.

Options:

A.

Interaction

B.

Oddity

C.

Coincidence

D.

Impossibility

Buy Now
Question # 20

A 1-Sample t-test is used when you want to compare the Median of one distribution to a target value.

Options:

A.

True

B.

False

Buy Now
Question # 21

The data on SPC charts are typically constructed such that they have the most recent data point on the right hand side.

Options:

A.

True

B.

False

Buy Now
Question # 22

A Belt concludes a Lean Six Sigma project with the creation of a Control Plan. At what point can the Control Plan be closed?

Options:

A.

Never, a Control Plan is a living document

B.

As soon as the Champion signs off

C.

Within 30 days of the LSS project review team meeting

D.

After the project has been presented at the recognition event

Buy Now
Question # 23

The Accuracy of a Measurement System addresses _________________.

Options:

A.

Stability, Bias & Linearity

B.

Repeatability & Reproducibility

C.

Stability & Sensitivity

D.

Precision & Sensitivity

Buy Now
Exam Code: CLSSGB
Exam Name: Certified Lean Six Sigma Green Belt (CLSSGB)
Last Update: Feb 23, 2025
Questions: 200
CLSSGB pdf

CLSSGB PDF

$25.5  $84.99
CLSSGB Engine

CLSSGB Testing Engine

$28.5  $94.99
CLSSGB PDF + Engine

CLSSGB PDF + Testing Engine

$40.5  $134.99