Question # 4

A 1OO-kW packaged engine-generate combined heat and power (CHP) system has the specifications listed below. The CHP equipment operates fully loaded for 8.000 h/yr. What isthe annual fuel cost for the ChP equipment?

CMP equipment specifications: Electrical output 100kw Electrical efficiency: 25% Thermal recovery efficiency: 50*6 Total CMP efficiency: 75%

Additional information: Fuel cost: S3.S0/GJ Electricity cost S0.06/kWh Previous water heating efficiency: 8046 Mot water usage: 75,700 liters/day (21 *C temperature rise)

[The question from the previous image, which was about calculating the annual cost of heat loss through a wall, but had a discrepancy between the calculated cost and the provided answer choices]

Options:

A.

$28,900/yr

B.

$32,668/yr

C.

$43,776/yr

D.

$52,222/yr

E.

$58,300/yr

Buy Now
Question # 5

What is the best type of heat exchanger to recover and transfer latent heat energy from one air stream to another?

Options:

A.

Heat pipe

B.

Shell and tube

C.

Ceramic recuperator

D.

Desiccant heat wheel

E.

Run-around system

Buy Now
Question # 6

Which type of single-phase alternating-current motor has the highest efficiency?

Options:

A.

Electronic-commutated motor

B.

Shaded-pole motor

C.

Permanent split-capacitor motor

Buy Now
Question # 7

Which of the advantages listed below, makes an ice TES system more preferred over a water TES system, when a load shifting strategy is considered?

Options:

A.

Ice-storage systems operate with a higher coefficient of performance (COP)

B.

Ice-storage systems require smaller storage tanks since ice has a higher energy storage density

C.

Water-storage systems require smaller storage tanks since water has a higher density than ice

D.

Ice-storage systems require lower maintenance due to lower pumping volume

Buy Now
Question # 8

In a chilled water thermal energy storage system, chilled water is stored at 4°C and used for supply water. Chilled water return is 14°C. Calculate the storage capacity required to hold 50 GJ of thermal cooling. (The specific heat of water (C) is 4.2 kJ/kg-°C. Assume no system losses.)

Options:

A.

766 m³

B.

1,191 m³

C.

1,356 m³

D.

2,618 m³

E.

4,180 m³

Buy Now
Question # 9

An energy-saving project costs $540,000. The project will have maintenance costs of $25,000 per year. The energy savings from the project are $160,000 per year. The project has a life of 10 years with no salvage value. The minimum attractive rate of return (MARR) is 10%. Using end-of-year cash flows, calculate the net-present value (NPV) of the project.

Options:

A.

$154,657

B.

$289,575

C.

$311,556

D.

$456,254

Buy Now
Question # 10

A cooling tower is delivering water to a chilled-water plant. The cooling tower outlet temperature has a 6°C approach temperature to the ambient air, wet-bulb temperature. The outside air conditions are 20°C dry bulb, 60% relative humidity. Using the psychrometric chart, at what temperature can the cooling tower deliver water to the chilled-water plant?

Options:

A.

13°C

B.

17°C

C.

21°C

D.

25°C

Buy Now
Question # 11

If outside air has a temperature of 30°C dry bulb and 20°C wet bulb, what is the dew point temperature?

Options:

A.

15°C

B.

20°C

C.

25°C

D.

30°C

Buy Now
Question # 12

What is the main reason for using instrumentation in energy audits?

Options:

A.

Save energy

B.

Determine energy flows

C.

Validate utility energy bills

D.

Support the local economy

Buy Now
Question # 13

What does a manometer measure?

Options:

A.

Pressure

B.

Volume

C.

Distance

D.

Voltage

Buy Now
Exam Code: CEM
Exam Name: Certified Energy Manager (CEM)