Question # 34

Which of the following best describes a thermally-light building?

Options:

A.

A building filled with manufacturing and process equipment

B.

A single-story office building where the load on the heating and cooling system is proportional to the outside air (ambient) temperature

C.

A computer data center housing multiple internet server racks

D.

An underground storage facility

Buy Now
Question # 35

Periodic commissioning of a building automation system (BAS) might include which of the following?

Options:

A.

Removing temperature set point overrides

B.

Retraining staff on the BAS functions and programming

C.

Verify controls are still responsive to the BAS

D.

All of the above

E.

Answers A and C

Buy Now
Question # 36

What type of heat transfer is reduced by adding insulation to the inside surface of a wall?

Options:

A.

Convection

B.

Conduction

C.

Radiation

Buy Now
Question # 37

What term describes the difference between the control signal value and the set point?

Options:

A.

Differential

B.

Dead band

C.

Error or offset

D.

Cut off

E.

Dead time

Buy Now
Question # 38

How can commissioning reduce the life-cycle cost to owners and operators?

Options:

A.

Reduce the cost of change orders during construction

B.

Improve the performance of energy systems

C.

Improve the satisfaction of building occupants

D.

Improve the effectiveness of operations and maintenance

E.

All of the above

Buy Now
Question # 39

An air conditioning unit cools make-up air from 25°C (dry bulb temperature) and 50% relative humidity down to 13°C. What type of heat has been removed from the air?

Options:

A.

Sensible heat

B.

Latent heat

C.

Both sensible and latent heat

D.

No heat energy has been removed

Buy Now
Question # 40

A steam trap with a 6-mm orifice in an 0.8-MPa steam system has failed open. The steam system is pressurized8.760 hours/yr. The steam cost is $15.00 /GJ. Using thetable below, what is the annualcost of the vented steam through the failed steam trap? ignore any condensate return issues.

[The question from the previous image, which was about calculating the annual cost of heat loss through a wall, but had a discrepancy between the calculated cost and the provided answer choices]

Options:

A.

$5,000/yr

B.

$10,000/yr

C.

$20,000/yr

D.

$30,000/yr

E.

$40,000/yr

Buy Now
Question # 41

Natural gas costs $4.80/GJ. How much does it cost to heat 500 liters of water from 18°C to 50°C using a natural gas water heater with an efficiency of 85%? [The efficiency and fuel price are both based on HHV. The specific heat of water (C) is 4.2 kJ/kg-°C.]

Options:

A.

$0.25

B.

$0.38

C.

$0.76

D.

$1.25

E.

$1.44

Buy Now
Question # 42

Which problems can be caused by poor power quality?

Options:

A.

Induction motors running backwards

B.

Equipment overheating

C.

Circuit breakers tripping

D.

All of the above

E.

Answers B and C

Buy Now
Exam Code: CEM
Exam Name: Certified Energy Manager (CEM)
Last Update: Apr 18, 2025
Questions: 130
CEM pdf

CEM PDF

$29.75  $84.99
CEM Engine

CEM Testing Engine

$33.25  $94.99
CEM PDF + Engine

CEM PDF + Testing Engine

$47.25  $134.99