The annual average particulate matter (PM2.5) outside of an office is 30 ug/m*. Which of the following indoor test results meets the requirements of Feature A01: Air Quality?
A)
B)
C)
D)
A new building project is to be located near a very busy road. Which of the following strategies should the WELL AP recommend at an early stage to minimize acoustic disturbance?
A WELL AP is monitoring the ongoing submission of documents required for a WELL Certified project. Which strategy should the WELL AP use to ensure the requirements are met?
Which thermal comfort parameter can be controlled by the use of automatic window shades?
The intent of Feature X01: Material Restrictions is to reduce or eliminate human exposure to building materials known to be hazardous. This feature restricts the amount of asbestos, mercury and what other material in newly installed building products?
Please click on the Project Scenario B button to review the project scenario and answer the following question.
BAY TOWERS BY BAYLEAF - SEATTLE, UNITED STATES - PROJECT SCENARIO B. Bay Towers by Bayleaf is a 20-floor commercial building overlooking Elliot Bay in Seattle, United States.
The building enjoys abundant natural light through floor to ceiling windows which take in Elliot Bay city views. Although located behind a major highway (four-lanes of traffic), there is a pedestrian bridge which connects their ground floor reception to the riverfront park on the other side of the highway.
The building is owned and operated by Bayleaf Inc., a real-estate organization. The building is leased at a 70% occupancy rate by a range of tenants, including those in finance, technology and healthcare. The total expected occupancy of the building is 1,000 people.
Bay Towers is mechanically ventilated and currently has MERV 11 filters. As the building owner, Bayleaf provides HVAC fit-out for tenant spaces, but tenants complete the interior walls and supply the finishes and furniture themselves. While no food is provided by Bayleaf, some individual tenants do have pantries where they provide their own snacks and beverages for their own employees.
Bayleaf manages the building and operates the ground floor which includes the reception, building management office, meeting rooms, as well as the elevator banks on each floor and the rooftop. Meeting rooms are common amenities that are able to be booked by the tenants. Bayleaf has two employees that work at desks onsite, a receptionist at the front desk and a property manager in the building management office.
PROJECT SCOPE & GOALS
Bayleaf has enrolled Bay Towers for WELL Core Certification to attract and retain high-quality tenants and address growing tenant demand for well-being facilities.
As part of the WELL Core Certification scope, Bayleaf intends to renovate their ground floor and are open to leveraging some of this space to include health and well-being programming.
The scope of renovation will also include upgrades to the base building, such as staircases, end-of-trip facilities and the air filtration system. The rooftop will also be converted into a public green space for tenants to use for recreation. Tables, chairs and barbeque facilities will be added, as well as several gardens, including edible plots and lawn areas.
Bayleaf is hoping their WELL Core Certification will provide some initial feature compliance for tenants wishing to also pursue WELL Certification for their spaces.
How many workstations need to be height-adjustable to satisfy the requirements of the preconditions?
Sick building syndrome is caused by the buildup of indoor pollutants which is linked to which of the following?
In one part of a university building the following rooms are all adjacent in a row and connected to the same corridor study room, classroom, classroom, recreation room, meditation room, classroom Which of the following rooms are most likely to require reprogramming or strategies for mitigating sound transmission?
A project in a defined WELL Portfolio achieved all 24 preconditions and 60 points through optimizations. How many total points can this project contribute toward the WELL Portfolio Score?
A WELL v2™ project is aiming for WELL Precertification. The project learn should submit documents that demonstrate compliance with all preconditions and which of the following allocations of points?