After deploying an AHV cluster connected to Cisco Nexus 9k switches, unexpected network behavior is observed. The consultant needs to rule out physical network mis-cabling without returning to the datacenter.
Which command from the host should the consultant run?
A customer is deploying Nutanix AHV clusters over hundreds of remote sites worldwide. Prism Central will be used to centrally manage all clusters. Customer security policy requires the use of MS Active Directory (AD).groups to authenticate all network devices.
Which method should be consultant use to meet the requirements?
A consultant has deployed a Nutanix cluster with AOS 5.10.x, then discovers the customer’s environment is running on AOS 5.6.x. The consultant decides to re-image the cluster using the foundation Java applet. During the Foundation discovery, all cluster nodes display a status of Unavailable.
What should the consultant do to resolve the issue?
A consultant needs to review a customer’s switch port configuration to identify any issues. Other customer requirements are as follows:
* Leverage LACP
* Native VLAN will not be used
* Use Multiple Upstream switches
* Use VLANs 20-25 and 30
* LACP Fallback has been Enabled
* vPC or MLAG has been configured
What must be included in a configuration in order to meet these requirements?
Refer to the exhibits.
A consultant is trying to test port failover on the node shown in the first exhibit. A continuous ping test is performed to the host. The consultant shuts down one of the links, after which the host ping request times out. The consultant tries to troubleshoot the issue with the customer and sees the information shown in the second exhibit on their Cisco Switches:
What is causing the issue?
A customer racks all nodes in the new cluster. The customer does not allow IPv6 for node discovery.
The consultant is not allowed to use the consultant’s own flat switch in the customer’s environment.
Which step should the consultant take to resolve this issue?
A customer wants to use NIC teaming on an ESXi host using a vSphere Standard Switch configured with the Route based on physical NIC load load balancing option. The customer does not see the option when editing the Teaming and Failover settings for the switch.
How should the consultant resolve this issue?
A customer wants to know the details of network validation testing.
Where can the consultant find this information?
What reference materials should be provided to the customer during the Knowledge Transfer?
A consultant has deployed a new Nutanix AHV cluster with Foundation. The customer requests separating the management and production traffic in the CVM.
Which feature should the consultant configure?