Weekend Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: Board70

DU0-001 Exam Dumps - APC NCPI Questions and Answers

Question # 4

How is the problem of Electro-Static Discharge(ESD) in the data center solved?

Options:

A.

By installing TVSS devices

B.

By installing RCD breakers in the PDU

C.

By connecting bimetallic strips to all racks

D.

By insulating IT equipment with rubber bushings

Buy Now
Question # 5

What are three benefits of row-oriented cooling architecture? (Choose three.)

Options:

A.

Predictable cooling

B.

Ease of deployment

C.

No raised floor required

D.

Reduced sensible heat ratio

E.

Increased mixing of air streams

Buy Now
Question # 6

MTBF is presented in which form?

Options:

A.

Hours

B.

Percent

C.

Distance

D.

Currency

Buy Now
Question # 7

What is a limiting factor when specifying the height of a rack / enclosure?

Options:

A.

Cable capacity

B.

Cooling requirements

C.

Overhead fire sprinklers

D.

Enclosure door clearance

Buy Now
Question # 8

Which two cooling architectures are flexible enough to adapt to ever-changing data center requirements? (Choose two.)

Options:

A.

Row

B.

Rack

C.

Room

D.

Building

Buy Now
Question # 9

Which two types of cables would you expect to see used in a network backbone?(Choose two.)

Options:

A.

Power cables

B.

Fiber optic cables

C.

Category 5/5e/6a cables

D.

Audio / video cables

Buy Now
Question # 10

What are two key characteristics of a UPS? (Choose two.)

Options:

A.

It tests voltages on IT equipment.

B.

It safeguards data in the event of a power loss.

C.

It measures energy consumption of IT equipment.

D.

It transfers IT equipment from utility to battery power.

Buy Now
Question # 11

Which statement describes the capability of a data cable installation?

Options:

A.

Category 5 cable can support 1 Gigabit Ethernet.

B.

Category 5e cable can support 1 Gigabit Ethernet

C.

Category 6a cable can support 10 Gigabit Ethernet.

D.

Category 6a cable can support 100 Gigabit Ethernet.

Buy Now
Question # 12

For reliable generator operation, what are two critical elements of the prime mover? (Choose two.)

Options:

A.

Air filter

B.

Fuel filter

C.

Noise filter

D.

Harmonic filter

Buy Now
Question # 13

When developing a management strategy, how long do organizations typically focus on fully implementing each management process before moving on to the next?

Options:

A.

One to three months

B.

Three to six months

C.

Six to nine months

D.

Nine to twelve months

Buy Now
Exam Code: DU0-001
Exam Name: Data Center University Associate Certification
Last Update: Feb 22, 2025
Questions: 324
DU0-001 pdf

DU0-001 PDF

$25.5  $84.99
DU0-001 Engine

DU0-001 Testing Engine

$28.5  $94.99
DU0-001 PDF + Engine

DU0-001 PDF + Testing Engine

$40.5  $134.99