Question 16

While performing a cost-benefit analysis, the Product Owner of a project determined that the project has 45% probability of incurring a loss of $800,000 due to the latest Land Reform Bill. Which of the following techniques is being used by the Product Owner to perform cost-benefit analysis?

Options:

A.

Expected Monetary Value.

B.

Probability Impact Grid.

C.

Pareto Analysis.

D.

Risk Breakdown Structure.

Question 17

You are the Scrum Master on a project to develop machine parts for automobile manufacturing. The Product

Owner on your project proposes to use Utility Function to find out the stakeholders' risk tolerance level. Which

of the following is NOT a risk tolerance classification?

Options:

A.

Risk Averter.

B.

Risk Seeker.

C.

Risk Mitigator.

D.

Neutral Risk Taker.

Question 18

What is the recommended size of a Development Team?

Options:

A.

5 to 12

B.

5 to 9

C.

3 to 9

D.

3 to 15

E.

3 to 6

F.

3 to 12

Question 19

Which one of the following is an output of Sprint Planning and is used to give the Development Team a Sprint target?

Options:

A.

Sprint Goal

B.

Roles and Responsibilities

C.

Product Backlog

D.

Team charter

Page: 4 / 5
Exam Code: SMC
Exam Name: Scrum Master Certified (SMC)
Last Update: Nov 21, 2024
Questions: 147
SMC pdf

SMC PDF

$28  $80
SMC Engine

SMC Testing Engine

$33.25  $95
SMC PDF + Engine

SMC PDF + Testing Engine

$45.5  $130