Winter Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: bigdisc65

Test Automation Engineer CT-TAE Exam Dumps

Page: 5 / 5
Question 20

When the SUT provides interfaces that can then be used to perform actions on the SUT, what is this called?

SELECT ONE OPTION

Options:

A.

Controllability

B.

Observability

C.

Portability

D.

Maintainability

Question 21

What represents good practice when automating a manual regression test suite?

Options:

A.

Test data shared between tests should, where feasible, be stored and accessed from a single source to avoid duplication or introduction of error.

B.

All existing manual tests should be decomposed into several smaller automated tests to reduce functional overlap.

C.

Remove inter-dependencies between tests to reduce automation failures and costly error analysis.

D.

Once a manual test has been automated, execute it immediately to Identify whether it operates correctly.

Question 22

Your organisation has successfully implemented a Test Automaton Solution (TAS) for a new project which has since been delivered into production via a number of sprints. A series of maintenance releases are now planned.

Some improvements were made to the Test Automation Architecture (TAA) as a result of feedback from the early sprints. The TAA improvements affected the TA, and the TAS was changed for the final sprint.

The new version of the TAS was generally well received but some performance and usability issues were encountered with the TAS which have yet to be addressed.

The test automation engineers supporting the maintenance releases must decide whether to use the enhanced TAS or the version that was used successfully for previous sprints.

What is the BEST action to take next?

Options:

A.

Perform an analysis of risks versus benefits for the enhanced TAS and then decide which version to use.

B.

Use the previous version because this was proven to work. It will be too risky to use the new version, with unresolved issues, for a live system.

C.

Use the new version because, despite some issues, it works, and the live system should not be tested using a different TAS.

D.

Use the new version of the TAS for the first maintenance release on a trial basis. If issues are encountered, switch to the previous version for later releases until the issues are resolved.

Question 23

You are using a gTAA to create a TAS for a project. The TAS is aimed specifically at automating a suit of existing manual test cases for standalone desktop applications. All the interfaces between the TAS and SUT will be from the CUI of the application.

Which of the following layers of the gTAA should you focus on for the TAS?

Options:

A.

The test Generation layer

B.

The Test Definition layer

C.

The Test Adaption layer

D.

The Test Execution layer

Page: 5 / 5
Helping Hand Questions for CT-TAE, Passed Exam Today CT-TAE, CT-TAE Exam Results, Test Automation Engineer CT-TAE Exam Dumps,
Exam Code: CT-TAE
Exam Name: Certified Tester Test Automation Engineer
Last Update: Nov 21, 2024
Questions: 80
CT-TAE pdf

CT-TAE PDF

$28  $80
CT-TAE Engine

CT-TAE Testing Engine

$33.25  $95
CT-TAE PDF + Engine

CT-TAE PDF + Testing Engine

$45.5  $130