Winter Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: bigdisc65

Passed Exam Today CT-TAE

Page: 3 / 5
Question 12

Which of the following BEST describes why it is important to separate test definition from test execution in a TAA?

Options:

A.

It allows developing steps of the test process without being closely tied to the SUT interface.

B.

It allow choosing different paradigms (e.g event-driven) for the interaction TAS and SUT

C.

It allows specify test cases without being closely tied to the tool to run them against the SUT

D.

It allows testers to find more defects on the SUT

Question 13

Your project is transitioning from manual to automated testing. You have decided to implement a pilot project so that lessons learned can inform future time estimates and schedules.

Which two of the following represent the types of test cases that are MOST suited to a test automation pilot project?

a) High added value test cases that require little effort to automate.

b) Test that are run infrequently as these will be simpler to automate

c) Reliability test cases that can show added value soon

d) Technically challenging test cases to provide the best validation of manual test conversion

e) Tests that are least Important to the business as these are safer to trial

Options:

A.

a and b

B.

a and c

C.

b and d

D.

c and e

Question 14

Designing the System Under Test (SUT) for testability is important for a good test automation approach and can also benefit manual test execution.

Which of the following is NOT a consideration when designing for testability?

Options:

A.

Observability: The SUT needs to provide interface that give insight into the system.

B.

Re-useability: The code written for the SUT must be re-useable for other similar system.

C.

Clearly defined architecture: The SUT Architecture needs to provide clear and understandable interfaces giving control and visibility on all test levels.

D.

Control: the SUT needs to provide interfaces that can be used to perform actions on SUT.

Question 15

A web application was released into production one year ago, it has regular release which follow a V-model lifecycle and testing is well-established and fully integration into the development lifecycle. You have been asked to implement a TAS for the regression test suite. The regression tests have been developed via the GUI and are expected to be run at least four times a month, for each planned release, for the whole operation solution life of the system (six years). Each screen of the GUI uses several third-party controls which are not compatible with the existing automation solutions. The environment for the automation will be stable, fully controllable and separated from other environments (development, staging, production).

What could be the MOST problematic for this TAS?

Options:

A.

Maturity of the test process

B.

Complexity to automate

C.

Frequency of use

D.

Sustainability of the automated environment

Page: 3 / 5
Exam Code: CT-TAE
Exam Name: Certified Tester Test Automation Engineer
Last Update: Nov 21, 2024
Questions: 80
CT-TAE pdf

CT-TAE PDF

$28  $80
CT-TAE Engine

CT-TAE Testing Engine

$33.25  $95
CT-TAE PDF + Engine

CT-TAE PDF + Testing Engine

$45.5  $130