You want to assign components to a General Maintenance Task List. What are prerequisites for assigning material components to a task list operation? Note: There are 2 correct answers to this question
Options:
A.
Assign the header material of a material BOM as assembly to a task list operation.
B.
Assign the BOM usage for free assignment of material in Customizing
C.
Assign the header material of a material ROM to the assembly field of the task list header
D.
Assign a piece of equipment with allocated material BOM to a task list operation.