Your customer plans to expand an existing nPar based on a single HPE Superdome Flex chassis. Which statement about workload availability during expansion is true?
Your customer wants to add a second HPE Synergy frame to an existing logical enclosure Based on a single HPE Synergy frame. The customer wants to use a highly available master setup.
Which procedures should De performed during the expansion process? (Select two.)
The proposal consists of.
- 3 HPE Synergy 12000 frames
- 6 HPE Composer 2 modules
- 2 HPE Virtual Connect SE 100 GO F32 Module
- 4 HPE Synergy 50 GO interconnect Link Module
Which statements about this proposed design are true? (Select two.)
Which statement about the SY480 Gen10 Plus Compute Module is true?