Black Friday Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: Board70

Legit 300-610 Exam Download

Page: 3 / 15
Question 12

Drag and drop the components from the left onto the descriptions on the right that indicate what occurs to Fibre Channel fabric when that component fails.

Options:

Question 13

Drag the requirements from the left onto the correct policy types on the right.

Options:

Question 14

Refer to the exhibit Due to power limitations at the customer data center, the engineering team must decommission one of the modular switches In the new design the customer must ensure that the OSPF process is fully protected on the remaining switch and minimize OSPF flapping in case of any module failure. Which solution fulfills the requirements for the new design?

Options:

A.

routing summarization

B.

graceful restart

C.

OSPF area separation

D.

LSA aging timer change

Question 15

Refer to the exhibit.

An engineer is configuring a QoS policy with these requirements

  • Match-all AF11 traffic and set it to a DSCP value of 14.
  • The committed rate must be 10 Mbps with a committed burst rate of 1000 ms
  • Drop any AF11 traffic that violates these settings.
  • Any traffic other than af11 must have a DSCP value of 0

The given class-map configuration already exists. Which solution must the engineer use to meet the requirements?

A)

B)

C)

D)

Options:

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Page: 3 / 15
Exam Code: 300-610
Exam Name: Designing Cisco Data Center Infrastructure (DCID)
Last Update: Nov 23, 2024
Questions: 204
300-610 pdf

300-610 PDF

$28.5  $94.99
300-610 Engine

300-610 Testing Engine

$33  $109.99
300-610 PDF + Engine

300-610 PDF + Testing Engine

$43.5  $144.99