Winter Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: bigdisc65

ISQI certification TMMi-P_Syll2020 iSQI Study Notes

Page: 5 / 8
Question 20

Study the following description:

“Testing is a thoroughly defined, well-founded and measurable process. Testing is perceived as evaluation; it consists of all lifecycle activities concerned with checking products and related work products.”

To which TMMi maturity level does this description apply?

Options:

A.

TMMi Level 2 Managed

B.

TMMi Level 3 Defined

C.

TMMi Level 4 Measured

D.

TMMi Level 5 Optimization

Question 21

Which of the following statements is TRUE with respect to TMMi Levels 4 and 5 in an Agile context?

Options:

A.

Because Agile projects tend to focus on defect detection rather than defect prevention, Process area 5.1 Defect Prevention is less relevant when assessing an Agile organisation for TMMi level 5.

B.

Process area 4.3 Advanced Reviews is less relevant in an Agile context because quality tends to be a team effort and verification and validation tend to be discussed at team meetings, not in formal reviews.

C.

When considering the achievement of specific goals in process area 5.3 Test Process Optimization in an Agile context, the deployment of new testing technologies and test improvements do not have to be made across the whole organization, since Agile teams are autonomous and can decide which improvements suit their way of working best.

D.

Agile projects normally do not use operational profiles or usage models of a product on which to base statistically valid inferences to help create a representative sample of tests, thus the TMMi level 5 specific goal “Testing is performed using Statistical Methods” is considered not relevant in an Agile context.

Question 22

Which of the following statements is TRUE?

Options:

A.

The maturity levels of TMMi describe detailed sub-practices for each specific goal.

B.

Each process area has exactly the same set of generic practices for generic goal 2.

C.

Specific goals can have different specific practices at different maturity levels.

D.

Sub-practices must be implemented together with the typical work products that are described for them in the TMMi model.

Question 23

A test process assessment has been performed at an embedded software organization. All process areas at TMMi Levels 2 and 3 were in scope of the assessment. Many practices required by the TMMi model are already in place, but the organization is missing a master test plan spanning multiple test levels.

Which of the following process areas would most likely need specific attention to address the above-mentioned shortcoming?

Options:

A.

Test Policy and Strategy

B.

Test Planning

C.

Test Organization

D.

Test Life Cycle and Integration

Page: 5 / 8
Exam Code: TMMi-P_Syll2020
Exam Name: TMMi - Test Maturity Model Integration Professional
Last Update: Nov 21, 2024
Questions: 111
TMMi-P_Syll2020 pdf

TMMi-P_Syll2020 PDF

$28  $80
TMMi-P_Syll2020 Engine

TMMi-P_Syll2020 Testing Engine

$33.25  $95
TMMi-P_Syll2020 PDF + Engine

TMMi-P_Syll2020 PDF + Testing Engine

$45.5  $130