Question 40

How often should customer satisfaction be measured?

(choose the best answer)

Options:

A.

Frequently.

B.

Quarterly.

C.

Daily.

D.

Annually.

Question 41

A new Developer is having continuing conflicts with existing members of the Scrum Team,

which is impacting the delivery of the Increment. If necessary, who is responsible for removing

the Developer from the Scrum Team?

(choose the best answer)

Options:

A.

The Product Owner is responsible, they control the return on investment (ROI).

B.

The Scrum Team is responsible.

C.

The Scrum Master is responsible, they remove impediments.

D.

The hiring manager is responsible, they hired the Developer.

Question 42

What is the timebox for the Sprint Review?

(choose the best answer)

Options:

A.

2 hours for a one-month Sprint.

B.

1 day.

C.

4 hours for a one-month Sprint.

D.

As long as needed.

Question 43

The "cone of uncertainty" can be used to do what?

(choose the best answer)

Options:

A.

Determine whether to cut quality, similar to the "Iron Triangle" of project

management.

B.

Determine the cost of a project before it begins.

C.

Illustrate that as a project forecast lengthens, it is increasingly less certain.

D.

Determine the length of the next Sprint.

Page: 10 / 13
Exam Code: PSPO-I
Exam Name: Professional Scrum Product Owner (PSPO I) Exam
Last Update: Dec 22, 2024
Questions: 177
PSPO-I pdf

PSPO-I PDF

$25.5  $84.99
PSPO-I Engine

PSPO-I Testing Engine

$28.5  $94.99
PSPO-I PDF + Engine

PSPO-I PDF + Testing Engine

$40.5  $134.99