The management software recommends that the optimal location of the server installation is not considered ( ).
A project requires the management system to access a third-party generator set, two smart meters 1 (same model), and two precision air conditioners (same model), then the management
system needs to report () a third-party equipment access fee ? (
When the power density of a single cabinet is greater than 10kl/R, which cooling form is recommended ()
Which of the following certifications has the PDU8000 precision power distribution cabinet passed: (multiple choice)