Winter Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: bigdisc65

H19-371_V1.0 Leak Questions

Page: 2 / 24
Question 8

Power supply architecture supported by half-cabinet chilled water temperature control ( ).

Options:

A.

Single power supply

B.

Dual power supply

C.

AB are both right

D.

Other.

Question 9

The compressors selected by Huawei's 25kW half-cabinet inverter air-cooled row-level air conditioners are first-class brands in the industry, which are:

Options:

A.

Copeland

B.

Danfoss

C.

EBM

D.

DAIKIN

Question 10

A project requires the management system to be connected to a third-party generator set, two smart meters (same model), and two precision air conditioners (same model), then the management system needs to

report ( ) a third-party equipment access fee?

Options:

A.

1

B.

3

C.

5

D.

None of the above is true.

Question 11

NetCol5000-A042H Full-cabinet row-level air-cooled variable frequency precision air conditioner can match the outdoor unit model and adaptable temperature range: ()/

Options:

A.

NetCol500-A026 (-20~45℃)

B.

NetCol500-A036 (-40~45℃ need to bring low temperature components)

C.

NetCol500-A072 (-5~55℃)

D.

NetCol500-A088 (-5~55℃)

Page: 2 / 24
Exam Code: H19-371_V1.0
Exam Name: HCS-Pre-sales-Digital Power V1.0
Last Update: Nov 21, 2024
Questions: 653
H19-371_V1.0 pdf

H19-371_V1.0 PDF

$28  $80
H19-371_V1.0 Engine

H19-371_V1.0 Testing Engine

$33.25  $95
H19-371_V1.0 PDF + Engine

H19-371_V1.0 PDF + Testing Engine

$45.5  $130