Winter Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: bigdisc65

Full Access iSQI CTAL-TM_Syll2012 Tutorials

Page: 2 / 8
Question 8

Which of the following statements is true regarding documentation standards? [2]

Options:

A.

Documentation standards are a lower priority than testing standards.

B.

Documentation standards can vary depending on the test level.

C.

Agile projects consistently use level test plans and documentation standards.

D.

Documentation standards are determined by the Project Manager.

Question 9

Which of the following is an advantage of specifying test conditions at a detailed level? [1]

Options:

A.

Can be used to identify test coverage gaps

B.

Saves time

C.

Can be used to leverage use cases for acceptance testing

D.

Improves maintainability and reduces ownership costs for the testware

Question 10

Which of the following is likely to occur if reviewers do not have an adequate level of technical knowledge? [1]

Options:

A.

There will be no impact as long as they have sufficient business knowledge.

B.

There will be no impact as long as they have sufficient process knowledge.

C.

The review is likely to be less efficient.

D.

The review will be shorter because any technical aspect can be skipped.

Question 11

Test Management

Which of the following statements, about the test reporting activities for a project adopting an iterative lifecycle model with very short iterations (e.g. two weeks iterations), is correct?

Number of correct responses: 1

K21 credit

Options:

A.

Test reporting activities can’t be influenced by the use of an iterative lifecycle model with short iterations

B.

Test reporting activities are not important for projects adopting an iterative lifecycle model with short iterations

C.

Test reporting activities are less important for projects adopting an iterative life cycle model with short iterations. They should be performed at the end of the last iteration

D.

Test reporting activities are still important with an iterative lifecycle. The reports can be used to conduct post-iteration review sessions before starting with the next iteration

Page: 2 / 8
Exam Code: CTAL-TM_Syll2012
Exam Name: ISTQB® Certified Tester Advanced Level - Test Manager [Syllabus 2012]
Last Update: Nov 21, 2024
Questions: 130
CTAL-TM_Syll2012 pdf

CTAL-TM_Syll2012 PDF

$28  $80
CTAL-TM_Syll2012 Engine

CTAL-TM_Syll2012 Testing Engine

$33.25  $95
CTAL-TM_Syll2012 PDF + Engine

CTAL-TM_Syll2012 PDF + Testing Engine

$45.5  $130