An administrator has two clusters: Site A and Site B.
Async DR is configured between the clusters as follows:
• Site A is the Primary Site
• Site B is the Secondary inactive Site, no VMs running
• Site A is fully in Production
• Site B used as Backup/Disaster Recovery
The customer wants to perform a planned failover between the sites.
How should the administrator accomplish this?
A customer needs a DR solution designed around the following requirements:
• There are 8 ms of latency between Sites A and B
• The administrator needs the shortest RPO/RTO possible
• Application consistent snapshots are required
• Use of Nutanix VSS
Which Data Protection Method should be used?
A Nutanix cluster is equipped with four nodes. Four VMs on this cluster have been configured with a VM-VM anti-affinity policy and are each being hosted by a different node.
What occurs to the cluster and these VMs during an AHV upgrade?
An administrator wants to utilize Network Visualization to monitor the physical and logical network on the Nutanix cluster. The first-hop switch has LLDP enabled. The network switch information is still not being displayed.
What is causing this problem?