Read this scenario thoroughly, and then answer each question that displays on the right side of the screen.
An architect proposes these products for a customer who wants a wireless and wired upgrade:
The architect also needs to propose a security plan for the solution. The customer has 900 employees and up to 30 guests a day. The customer wants to protect the internal perimeter of the network with authentication and simple access controls. The customer is most concerned about wireless security, but also wants to ensure that only trusted users connect on the wire. However, the customer also wants all wired traffic to be forwarded locally on access layer switches. The customer already has a third-party firewall that protects the data center.
The customer wants to use certificates to authenticate user devices, but is concerned about the complexity of deploying the solution. The architect should recommend a way to simplify. For the most part users connect company-issued laptops to the network. However, users can bring their own devices and connect them to the network. The customer does not know how many devices each user will connect, but expects about two or three per-user. DHCP logs indicate that the network supports a maximum of 2800 devices.
Refer to the provided scenario. Which ClearPass licenses should the architect include in the proposal?
An architect plans 12 APs for an auditorium that is 325 square meters (3, 498 square feet). Each AP has one 2.4 GHz radio and one 5 GHz radio. Both types of radios use 20 MHz channels.
Assume that DFS channels can be used in this design. How many 5 GHz collision domains does this design provide?
Refer to the exhibit.
Exhibit 1.
Exhibit 2.
Exhibit 1 shows the logical plan, and Exhibit 2 shows the BOM that the administrator has made in Iris. What is missing from the IRIS BOM?
Refer to the exhibit.
Exhibit 1 shows the logical plan, and Exhibit 2 shows the BOM created with IRIS. An architect plans to propose two 5406Rzl switches as a VSF fabric for a campus network core. Which issue with the plan should the architect correct?