Winter Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: bigdisc65

Exactprep LEED-AP-BD+C Questions

Page: 9 / 19
Question 36

A project team is deciding on the impact of a proposed concrete walkway. Which of the following will be impacted as a result of adding the walkway?

Options:

A.

Site's impervious cover

B.

Project density calculations

C.

Erosion and sediment control plan during construction

D.

Air quality as a result of off gassing that occurs as concrete cures

Question 37

How is the distance between the project site and the manufacturing location determined for Materials and Resources Credit. Building Disclosure and Optimization - Sourcing of Raw Materials. Option 2. Leadership Extraction Practices?

Options:

A.

Roadway distance

B.

Straight line distance

C.

Rail freight distance

D.

Air freight distance

Question 38

For an emergency care facility project, which of the following credits can be achieved if the total cost of

permanently installed products are 25% cradle-to-cradle V3 Gold and 25% GreenScreen List Translator?

Options:

A.

Materials and Resources Credit, Building Life-Cycle Impact Reduction, Option 3. Building and Material Reuse

& Innovation Credit, Innovation, Exemplary Performance

B.

Materials and Resources Credit, Furniture and Medical Furnishing, Option 3. Multi-Attribute Assessment of

Products & Innovation Credit, Innovation, Exemplary Performance

C.

Materials and Resources Credit, Building Product Disclosure and Optimization, Material Ingredients, Option 2.

Material Ingredient Optimization & Innovation Credit, Innovation, Exemplary Performance

D.

Materials and Resources Credit, Furniture and Medical Furnishings, Option 3. Multi-Attribute Assessment of

Products & Materials and Resources Credit, Building Product Disclosure and Optimization, Material Ingredients, Option 2. Material Ingredient Optimization

Question 39

Based on the results of a six-hour waste stream study, the project team for a retail project plans to provide dedicated areas for four easily recyclable waste streams: cardboard, plastic, metal and paper. The project is open to the public 10 hours a day, six days a week. Which of the following actions should be the project team's top priority in order to demonstrate the minimum requirements to achieve Materials and Resources Prerequisite,

Storage and Collection of Recyclables?

Options:

A.

Take appropriate measures for the safe collection, storage and disposal of batteries

B.

Make a waste stream projection for the entire year based on the six hours of the waste stream study

C.

Make a waste stream projection for the entire week, based on the six hours of the waste stream study

D.

Extend the waste stream study to cover a representative time period of a minimum of 24 hours to identify the top five recyclable waste streams

Page: 9 / 19
Exam Code: LEED-AP-BD+C
Exam Name: LEED AP Building Design + Construction (LEED AP BD+C)
Last Update: Nov 21, 2024
Questions: 269
LEED-AP-BD+C pdf

LEED-AP-BD+C PDF

$28  $80
LEED-AP-BD+C Engine

LEED-AP-BD+C Testing Engine

$33.25  $95
LEED-AP-BD+C PDF + Engine

LEED-AP-BD+C PDF + Testing Engine

$45.5  $130