Black Friday Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: Board70

Download Full Version AD01 Blue Prism Exam

Page: 12 / 13
Question 48

Consider the following process flow from the Main Page of a process in Process Studio:

Thinking about the standard Blue Prism Process Templates, what is wrong with this Main Page process flow?

Options:

A.

There is nothing wrong with the Main Page flow shown in the image, it is a copy of Blue Prism's standard Process Template

B.

The Stop? decision stage should be removed from the process flow, as Stop time is Configured either within the Scheduler process are stopped via Control Room.

C.

The Mam Page process flow is too high level For better visibility of the process logic the flow steps hidden m the sub-pages should al be on the main page instead.

D.

There is no exception handling on this Main Page so any exceptions that "bubble up" will cause the process to terminate rather than exceptions being handled correctly.

E.

The Reset Global Data page is not required because sub-page within a process should always use input parameter rather than global data items. There should be no global data to reset.

Question 49

Study the process flow below:

The outputs for the Get Next Case are configured below:

What is the correct configuration of the Expression in the ‘’Case Returned ‘’ decision stage?

A)

B)

C)

D)

Options:

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Question 50

Which of the following flows can you not create in Blue Prism? (select 2 responses)

A)

B)

C)

D)

Options:

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Question 51

According to Blue Prism best practice which of the following information would be appropriate to store in a Work Queue tag? (select 3 responses)

Options:

A.

Something that identifies the type of work that was performed Example tags might be: Funds Transferred, SIM Card Requested, Account, Closed, Account Suspended, Account Noted

B.

Something that identifies exact datetime of a step in the process. Example of tags might include Account Closed 20/03/2017 12:12:16, Work

Completed 20/03/2017 12:12:16: Request Loaded 20/03/2017 12:12:16

C.

Something that identifies the source of work. Example of tags might include: Email, Web Form, Excel Adhoc. Database

D.

Something that identifies the client record to make work queue items easier to search. Example tags might be a phone number, customer reference number or ID, customer full name. For example: +4407994446767, 00023231 A; Mr John A Smith

E.

Something that identifies the type of process scenario. Example of tags might include: Invalid Product, Unrecognised customer, Goneaway Marker, Invalid Status

F.

Details of an exception that has occurred. For example: The Login Screen was not found.

Page: 12 / 13
Exam Code: AD01
Exam Name: Blue Prism Accredited Developer Exam
Last Update: Nov 24, 2024
Questions: 189
AD01 pdf

AD01 PDF

$25.5  $84.99
AD01 Engine

AD01 Testing Engine

$28.5  $94.99
AD01 PDF + Engine

AD01 PDF + Testing Engine

$40.5  $134.99