Winter Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: bigdisc65

CTFL2018 CTFL_Syll2018 Updated Exam

Page: 20 / 27
Question 80

Which of the following metrics could be used to monitor progress along with test preparation and execution? [K1]

Options:

A.

The total number of tests planned

B.

The total number of requirements to be tested

C.

The failure rate in testing already completed

D.

The number of testers used for test execution so far

Question 81

What is the main reason for using a pilot project to introduce a testing tool into an organization? [K1]

Options:

A.

To identify the requirements for using a tool

B.

To make a selection between alternative tools

C.

To assess whether the tool will be cost- effective

D.

To ensure the tools fits existing processes without change

Question 82

A client-server system for a web development must support a minimum of 200 enquiries per hour. In peak times, it must be available 24 hours x 7 days due to the critical nature of the application, and must have a response time lower than 20 seconds during peak loads.

Which of the following set of test types would be most appropriate to verify the non-functional requirements expressed in this statement?

Options:

A.

Performance, Usability, Regression.

B.

System, Load, Fail-over.

C.

Performance, Load, Stress.

D.

Load, Volume and Component.

Question 83

Which of the following is a valid objective of testing? [K1]

Options:

A.

Correcting defects

B.

Locating defects in the code

C.

Preventing defects

D.

Ensuring no defects are present

Page: 20 / 27
Exam Code: CTFL_Syll2018
Exam Name: ISTQB Certified Tester Foundation Level (Syllabus 2018)
Last Update: Nov 7, 2024
Questions: 365
CTFL_Syll2018 pdf

CTFL_Syll2018 PDF

$28  $80
CTFL_Syll2018 Engine

CTFL_Syll2018 Testing Engine

$33.25  $95
CTFL_Syll2018 PDF + Engine

CTFL_Syll2018 PDF + Testing Engine

$45.5  $130