Question # 44

Which from the following list are typically found to enable the review process to be successful? [K2]

a. Each review has clear defined objectives

b. The lower the number of defects, the better the review process

c. The right people for the review objective are involved

d. There is an emphasis on learning and process improvement

e. Management are not involved in the process at all

f. Checklists should not be used, as these slow down the process

g. Defects found are welcomed and expressed objectively

Options:

A.

a, f and g.

B.

b, c and f.

C.

a, c and d.

D.

d, e and g.

Buy Now
Question # 45

Which of the following best describes the Black-box technique?

Options:

A.

It uses decision coverage for completeness.

B.

It ensures all possible branches in the code are tested.

C.

It is based on the internal structure of the system.

D.

It can be done without reference to the internal structure of the component or system.

Buy Now
Question # 46

Which of the following processes ensures that all items of testware are identified, version controlled, tracked for changes, so that traceability can be maintained throughout the test process?

Options:

A.

Software traceability process

B.

Incidence management process

C.

Testing design process

D.

Configuration management process

Buy Now
Question # 47

A client-server system for a web development must support a minimum of 200 enquiries per hour. In peak times, it must be available 24 hours x 7 days due to the critical nature of the application, and must have a response time lower than 20 seconds during peak loads.

Which of the following set of test types would be most appropriate to verify the non-functional requirements expressed in this statement?

Options:

A.

Performance, Usability, Regression.

B.

System, Load, Fail-over.

C.

Performance, Load, Stress.

D.

Load, Volume and Component.

Buy Now
Question # 48

Which of the following test design techniques is classified as a structure-based (white box) technique? [K1]

Options:

A.

Exploratory testing

B.

Decision table testing

C.

State transition testing

D.

Statement testing

Buy Now
Question # 49

Test script TransVal 3.1 tests transaction validation via screen TRN 003B. According to the specification (PID ver 1.3 10b iv) the validation screen should not accept future dated transactions. Test script TransVal 3.1 passes. Test script eod 1.4 tests end of day processing and is run after the execution of TransVal 3.1 using data entered during that test

Which of the following is the BEST detail on an incident report? [K3]

Options:

A.

Title. End of Day failure.. Reproducible. Yes. Description. Script eod 1.4 fails when the first transaction of the day is a future dated transaction. Screen shot of the failure attached.

B.

Title. Transaction input screen validation..Reproducible. Yes. Description. Script eod 1..4 fails . Screen shot of the failure attached. Validation of transaction entryon screen TRN-003B should not allow future dated transactions – see PID ver 1.3 para 10b iv.

C.

Title. Screen TRN-003B validation of transaction date.. Reproducible. No. Description. When a future dated transaction is processed by the end of day process, a failure can occur. This does not always happen. Screen shot of the failure attached.

D.

Title. Screen TRN-003B validation of transaction date. Reproducible. Yes. Description. Script eod 1.4 fails when the first transaction of the day is a future dated transaction. Screen shot of the failure attached. Validation of transaction entry on screen TRN-003B should not allow future dated transactions – see PID ver 1.3 para 10b iv.

Buy Now
Question # 50

Which of the following is a valid objective of testing? [K1]

Options:

A.

Correcting defects

B.

Locating defects in the code

C.

Preventing defects

D.

Ensuring no defects are present

Buy Now
Question # 51

Which of the following is a consideration when deploying test execution tools? [K1]

Options:

A.

Data-driven testing cannot be used with test execution tools

B.

Recorded manual tests may become unstable in use

C.

Keyword-driven testing cannot be used with test execution tools

D.

Expected results for tests are not required because the tool generates expected results

Buy Now
Question # 52

Of the following, select the best description of the fundamental test process:

Options:

A.

Planning and control, analysis, design, implementation, execution, evaluation of exit criteria and reporting, test closure.

B.

Executing tests, identifying and recording defects and preparing recommendation and closure reports.

C.

Controls, preparation of test cases, execution of test cases, execution of regression packs, communicating with developers, writing recommendations for release.

D.

Static testing, dynamic testing, defect reporting, reporting and closure.

Buy Now
Question # 53

Which of the following would typically be identified using static analysis by tools? [K1]

Options:

A.

Spelling mistake on an error message

B.

A potential infinite loop

C.

Memory leakage

D.

A variable set to the wrong value

Buy Now
Exam Code: CTFL-Foundation
Exam Name: ISTQB Certified Tester Foundation Level
Last Update: Feb 23, 2025
Questions: 272
CTFL-Foundation pdf

CTFL-Foundation PDF

$25.5  $84.99
CTFL-Foundation Engine

CTFL-Foundation Testing Engine

$28.5  $94.99
CTFL-Foundation PDF + Engine

CTFL-Foundation PDF + Testing Engine

$40.5  $134.99