Question # 4

What is an advantage of aggregating the results of performance testing?

Options:

A.

Aggregated results provide more detail and allow for a more complete analysis of the test.

B.

Testing is expedited when the results are aggregated.

C.

It is easier for stakeholders to draw a correct conclusion from aggregated results.

D.

Aggregated results show when testing has been completed.

Buy Now
Question # 5

Which of the following is typically the result of oversaturation of system resources during performance testing?

Options:

A.

Response time will gradually improve over a period of time.

B.

Response time will be slow under significant load levels.

C.

Error logging will decrease.

D.

The size of the database will gradually decrease.

Buy Now
Question # 6

Which of the following is the most economical solution to minimize costs and time for performance testing for a high-end production client-server platform?

Options:

A.

Isolated lab environment

B.

Cloud-based environment

C.

Mainframe environment

D.

No environment

Buy Now
Question # 7

Which of the following is considered a common database protocol?

Options:

A.

ODBC

B.

JUNIT

C.

SMP

D.

MMS

Buy Now
Question # 8

Which of the following should be a key part of your test acceptance criteria in your performance test plan?

Options:

A.

Convincing technical and business stakeholders to provide realistic performance goals for the regional servers

B.

Describing the system under test in order to provide context to the metrics

C.

Highlighting any technical differences in the hardware between the test environment and the production environment

D.

Documenting previously baselined performance metrics in order to compare these to the new performance measurements

Buy Now
Question # 9

What is the primary purpose of a load generator?

Options:

A.

Create a steady and consistent background load on the system

B.

Simulate user behavior in accordance with the defined operational profile

C.

Record and analyze the behavior of the system as it is executing the prescribed tests

D.

Support root cause analysis when performance degradation is encountered

Buy Now
Question # 10

You are managing the testing efforts of an existing distributed system that manages inventories of automobile and light truck tires from multiple warehouses across the country. The system is being enhanced to track incoming restocking shipments at the point of entry to the warehouse and outbound sales shipments at the point of shipment from the warehouse, all of which are executed in real-time. System loads traditionally peak on Mondays due to built-up demand from the previous weekend.

You are preparing a presentation to the business stakeholders, outlining your performance testing strategy.

Which of the following is appropriate to present to this audience?

Options:

A.

Established HTTP response per second goals that will have acceptable minimum, maximum, and average response times

B.

A test plan that includes specific technical specifications for the computing hardware to be used for performance testing

C.

A comprehensive list of support staff to be available during performance testing, including key members of the application development team

D.

The risks that may exist due to platform differences between the test environment and the production environment

Buy Now
Question # 11

What challenge must be considered when using crowds to emulate load generation?

Options:

A.

The load generation will be difficult to reproduce.

B.

The load generation method is less sensitive to changes in the III.

C.

This type of load generation is more suitable for mainframe applications.

D.

This technique is more precise than other methods of load generation.

Buy Now
Question # 12

What challenge must be considered when using crowds to emulate load generation?

Options:

A.

The load generation will be difficult to reproduce.

B.

The load generation method is less sensitive to changes in the system under test.

C.

This type of load generation is more suitable for mainframe applications.

D.

This technique is more precise than other methods of load generation.

Buy Now
Question # 13

Stakeholders were unhappy with previous performance test results, which indicated that the adjustments were not made fast enough and engine stall was probable. The developers have now made changes that they believe will significantly improve the performance of the adjustments.

What should you do to ensure the performance test objectives have been properly defined before you run the next set of performance tests?

Options:

A.

Understand the delta between the results from previous performance tests and the results from the expected performance improvements.

B.

Adjust stakeholder expectations to be more aligned with the reality of the previous test results.

C.

Realign performance test objectives with business stakeholders to meet project milestone dates.

D.

Realign performance test objectives with all stakeholders to meet time-to-market goals.

Buy Now
Exam Code: CT-PT
Exam Name: ISTQB Certified Tester - Performance Testing
Last Update: Mar 14, 2025
Questions: 40
CT-PT pdf

CT-PT PDF

$25.5  $84.99
CT-PT Engine

CT-PT Testing Engine

$28.5  $94.99
CT-PT PDF + Engine

CT-PT PDF + Testing Engine

$40.5  $134.99