Question # 4

If an operation on a routing is performed out of sequence and the change in sequence is not reported to the formal system, which of the following situations will occur?

Options:

A.

An alternate routing will be created.

B.

The capacity requirements planning data will be inflated.

C.

The order will appear on a dispatch list in the wrong work center.

D.

The error will be corrected by cost accounting.

Buy Now
Question # 5

A supplier of roller bearings makes lots of 10,000 and sorts them automatically according to size. In a typical lot of 10,000, the sizes break into the following categories:

{exhibit 1213}

The product requires rollers on target or, at most, 0.0001 oversize. Experience indicates that 100% must be reinspected before use because the machine inspection lets a few defective units slip through. The supplier should be encouraged to take which of the following actions?

Options:

A.

Learn what factors cause variability.

B.

Tighten the inspection criteria.

C.

Seek deviations from Quality Control.

D.

Doubly inspect the rollers

Buy Now
Question # 6

The implementation of a program designed to reduce changeover times will result in a temporary capacity shortage. This shortage will be handled by using some older equipment and by subcontracting some work. Which of the following methods should the company use to control capacity during this period?

Options:

A.

Kanban

B.

Demand management

C.

Flow control

D.

Input/output control

Buy Now
Question # 7

When a company moves from sampling inspection to internal process control, which of the following actions should be taken prior to evaluating supplier performance?

Options:

A.

Plan and analyze results.

B.

Conduct a supplier kaizen.

C.

Establish quality criteria.

D.

Establish target inventory levels.

Buy Now
Question # 8

To reduce the cost of transaction processing, a repetitive manufacturer first would implement:

Options:

A.

inventory staging.

B.

a point-of-sale system.

C.

point-of-use storage.

D.

cycle counting.

Buy Now
Question # 9

Structured problem solving provides what essential result to an organization?

Options:

A.

Recognition of problems in the company's competitive position

B.

Resolution of problems of other organizations in like markets or with similar customers

C.

Recognition of problems with the company's management team

D.

Resolution of both strategic and operational problems

Buy Now
Question # 10

The question below is based on the following information:

{exhibit 1528}

What is the available capacity in hours for a 20-workday month?

Options:

A.

160

B.

180

C.

240

D.

320

Buy Now
Question # 11

A production manager uses a hoshin plan to communicate:

Options:

A.

financial status.

B.

operational issues.

C.

new ideas.

D.

strategy.

Buy Now
Question # 12

A manufacturing facility is considering adopting cellular flow. Which of the following factors is most important to consider?

Options:

A.

Availability of shipping methods

B.

Maturity of the product line

C.

Distance to the supplier

D.

Stability of the production schedule

Buy Now
Question # 13

A plant that implements a total preventive maintenance program would be likely to:

Options:

A.

acquire the latest in computer-controlled production equipment.

B.

use statistical process control to identify equipment problems.

C.

involve production workers directly in maintaining and managing production equipment.

D.

identify and remove the causes of abnormal instrumentation and tooling variation.

Buy Now
Exam Code: CPIM-ECO
Exam Name: Execution and Control of Operations
Last Update: Mar 9, 2025
Questions: 105
CPIM-ECO pdf

CPIM-ECO PDF

$25.5  $84.99
CPIM-ECO Engine

CPIM-ECO Testing Engine

$28.5  $94.99
CPIM-ECO PDF + Engine

CPIM-ECO PDF + Testing Engine

$40.5  $134.99