Month End Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: Board70

CLSSBB Exam Dumps - GAQM Lean Six Sigma Black Belt Certification Questions and Answers

Question # 14

This table displays the inventory of fasteners in a storage cabinet. A bolt is selected at random from the fastener cabinet. Find the approximate probability it is size 7/8.

Options:

A.

11

B.

.08

C.

.09

D.

.30

E.

none of the above

Buy Now
Question # 15

This is an example of part of a:

Options:

A.

QFD Matrix

B.

Activity Network Diagram

C.

Interrelationship Diagram

D.

Affinity Diagram

Buy Now
Question # 16

This table displays the inventory of fasteners in a storage cabinet. An item is selected at random from the fastener cabinet.

Find the approximate probability it is a 1/2 inch bolt.

Options:

A.

.65

B.

.30

C.

.09

D.

.35

E.

none of the above

Buy Now
Question # 17

If the probability that event A occurs is 0.51, the probability that event B occurs is 0.64 and that probability that both A and B occur is 0.23 then:

Options:

A.

events A and B are complementary

B.

events A and B are mutually exclusive

C.

events A and B are supplementary

D.

events A and B are not mutually exclusive

E.

events A and B are statistically independent

Buy Now
Question # 18

There are 14 different defects that can occur on a completed time card. The payroll department collects 328 cards and finds a total of 87 defects. DPMO =:

Options:

A.

87 ÷ 328

B.

87 ÷ (328 × 14)

C.

14 ÷ 87

D.

87 ÷ 14 × 1,000,000

E.

328 ÷ 87

F.

87 × 1,000,000 ÷ (14 × 328)

Buy Now
Question # 19

Find the value of (4) in the ANOVA table. Assume:

Options:

A.

16.4

B.

3.2

C.

18.6

D.

23.2

E.

4.54

F.

12.2

G.

0.525

Buy Now
Question # 20

The primary metric for a project is reduced cost for process A .A consequential metric could be:

Options:

A.

reduced cycle time

B.

reduced scrap rate

C.

reduced set-up time

D.

all the above

E.

none of the above

Buy Now
Question # 21

Find the value of (7) in the ANOVA table. Assume:

Options:

A.

16.4

B.

3.2

C.

18.6

D.

23.2

E.

4.54

F.

12.2

G.

0.525

Buy Now
Question # 22

Is it safe to assume that the interaction effects are negligible?

Options:

A.

yes

B.

no

C.

probably

Buy Now
Question # 23

The primary metric for a project is reduced cost for process A. Baseline data might include:

Options:

A.

current maintenance costs

B.

current selling price for the products or services output by process A

C.

current suggestions from stakeholders of process A

D.

all the above

E.

none of the above

Buy Now
Exam Code: CLSSBB
Exam Name: Certified Lean Six Sigma Black Belt (CLSSBB)
Last Update: Jan 31, 2025
Questions: 227
CLSSBB pdf

CLSSBB PDF

$25.5  $84.99
CLSSBB Engine

CLSSBB Testing Engine

$28.5  $94.99
CLSSBB PDF + Engine

CLSSBB PDF + Testing Engine

$40.5  $134.99