The electrical diagram of the data center shows the following UPS configuration and has a load of 80 kW.
What is the set-up in this data center?
What is a potential disadvantage of using a hypoxic-based fire suppression system as a fire extinguishing system?
The 'maximum exposed area' of the fire-rated glass is defined by the supplier as 3 sqm/32 sqft. The window area is 4 sqm/43 sqft.
What would be the best option?
Smoke sensors need to be tested to ensure that they pick up a potential fire in the data center.
What should you recommend?
From the options indicated, what is the correct starting point for the raised floor installation?
Management has requested a 15-minute battery bank assuming full load on the UPS. The UPS vendor has provided the following specifications of the UPS:
•Rated power: 30 kVA
•Rectifier input voltage: 400 V/3 phase
•Rectifier input power factor: 0.8
•Battery rated voltage: 384 V
•Number of cells: 192
•End of discharge voltage: 308 V
•Inverter output voltage: 400 V/3 phase
•Inverter output power factor: 0.8
What information is missing to perform the battery calculation?