Question # 4

What needs to be installed in the battery room when using Lithium-ion batteries?

Options:

A.

A battery management system to monitor and prevent unsafe temperatures during charging/discharging.

B.

High capacity air-conditioning equipment since Lithium-ion batteries are sensitive to high temperatures, which can reduce their lifetime.

C.

A proper ventilation system since Lithium-ion batteries produce highly flammable Hydrogen gas during charging.

D.

A proper supply of distilled water.

Buy Now
Question # 5

Which type of Humidifier rapidly vibrates waster to create a fog or mist?

Options:

A.

Infrared Humidifier

B.

Water Canister Humidifier

C.

Steam Canister Humidifier

D.

Ultrasonic Humidifier

Buy Now
Question # 6

Which one of the following is an AC Power Quality Anomaly?

Options:

A.

Signal Distortion

B.

Waveform Distortion

C.

Backup Condition

D.

Attenuation

Buy Now
Question # 7

Which one of the following is an example of Direct Cost?

Options:

A.

Legal fees

B.

Damaged brand perception

C.

Negative public relations

D.

Reduced customer satisfaction

Buy Now
Question # 8

Do I need to check the local standards if I already comply to international standards?

Options:

A.

Local standards do not to be checked as some countries have too many local standards, which will slow down the data centre construction.

B.

You need to check the local standards to ensure compliance to these standards.

C.

Compliance to only international standards is good enough as most local standards are derived from international standards.

D.

Data centres only need to comply to international standards since they are connected to a worldwide international network infrastructure.

Buy Now
Question # 9

Which design consideration should be implemented with an Inergen-based fire suppression system?

Options:

A.

Install protective covers around the nozzles to avoid accidental gas dumps.

B.

Install the gas containers (tanks) close to the data centre.

C.

To use Inergen only for fires which are not related to electrical power.

D.

Pressure relief valves are required in the room that needs protection.

Buy Now
Question # 10

systems are designed specifically to protect the structure of a building.

Options:

A.

Pro-inert

B.

Inergen

C.

Water sprinkler

D.

Total Flooding

Buy Now
Question # 11

is the degree to which a system or component is operational and accessibility when required for use.

Options:

A.

Scalability

B.

Agility

C.

Reliability

D.

Availability

Buy Now
Question # 12

What is a requirement of an FM200 (HFC-227) installation?

Options:

A.

It is a high-pressure gas; therefore nozzles must be mounted with two brackets.

B.

Drainage system under the raised floor.

C.

Install the gas containers (tanks) close to the data centre.

D.

Install pre-action sprinklers in the same room as the FM200.

Buy Now
Question # 13

What is the main advantage of busbar trunking compared to stand electrical cabling?

Options:

A.

Busbar trunking is less expensive.

B.

Busbar trunking has a fixed power rating.

C.

Busbar trunking allows for flexibility.

D.

Busbar trunking can be located both overhead and under the raised floor.

Buy Now
Exam Code: CDCP
Exam Name: Certified Data Centre Professional (CDCP)
Last Update: Feb 22, 2025
Questions: 73
CDCP pdf

CDCP PDF

$25.5  $84.99
CDCP Engine

CDCP Testing Engine

$28.5  $94.99
CDCP PDF + Engine

CDCP PDF + Testing Engine

$40.5  $134.99