An architect is designing a solution for a customer who plans to grow its VDI environment. The design must allow for scaling of the environment in incremental steps with predictable results.
Which can the architect recommend for capacity management?
A company has decided to implement Workspace One on premise.
During a proof of concept (POC), users noted that it was too cumbersome to enter Active Directory username and password and RSA SecureID using mobile devices.
The Chief Security Officer (CSO) stated:
Which solution can satisfy the CSO’s requirements?
When meeting with a customer, these VM template requirements for instant-clone are determined:
Which is the formula to design a 40% utilization strategy for 80 desktops, given the above requirements?
During recent SQL server maintenance, an issue was reported where some users were unable to access some of their assigned applications within the VDI environment. All users report being able to still connect to their instant clone desktops.
Which condition might account for the outage?
A customer is looking to implement a VMware solution with these requirements:
An architect is tasked with determining the lowest cost license solution that will meet the customer’s requirements.
Which solution should the architect choose?
An architect is deploying Horizon 7.0 on vSAN 6.2. The architect wants to take advantage of the erasure coding feature to save disk space. Each host contains 4TB of capacity flash disk. The desktop base image has 2GB of RAM and a 40GB C: drive. The cluster must support 200 concurrent users.
Which two configurations satisfy requirements? (Choose two.)
A company has decided to virtualize all of its helpdesk employee’s workstations.
These requirements must be met:
Which three features can be enabled to meet the company’s requirements? (Choose three.)
A hospital is looking to introduce a new work model. Their goal is to allow doctors and nurses to access care applications more flexibly. An important task is that Android and iOS tablets be allowed for hospital staff. The IT department is faced with the task of executing on the requirements.
The current client environment is:
Any solution must be in production within 6 months. IT was approved to start building a non-optimized solution to get things started. At a later date, investments will be spent on optimizing the solution. There is no time for a proper application assessment and user segmentation, so the solution must support as broad a user base as possible.
The main priorities for the design are:
What solution would support the main priorities?
In a local design, a company selected one database instance to be shared by Horizon View Composer database, vCenter external database, and Horizon AppVolumes database. The design must provide High Availability for all databases.
Which two database server options should be selected during physical design creation? (Choose two.)
A customer wants to deploy VMware Horizon View to support virtual desktops hosted in two different physical locations. It wants users to connect to the location nearest to them to start a session.
Which three steps must be completed to enable this functionality? (Choose three.)