Question # 24

A Cloud Service Provider wants to introduce backup as a service for a customer’s vSphere-based virtual machines.

The following information is noted:

  • They have a single four-port (2 × 10 GbE and 2 × 1 GbE) NIC per ESXi host
  • All top-of-rack (ToR) switches are 10 GbE and fully populated
  • The backup traffic must not impact existing services

Which two recommendations should the architect make to help the customer incorporate the service? (Choose two.)

Options:

A.

Enable and tag traffic on the backup distributed port group

B.

Add a new two-port 10 GbE NIC per ESXi host

C.

Replace the existing NIC with a two-port 25 GbE NIC per ESXi host

D.

Match the Class of Service (CoS) and Differentiated Services Code Point (DSCP) values to the physical network

E.

Create a new virtual switch using the 1 GbE uplinks

Buy Now
Question # 25

An architect is tasked with designing a greenfield VMware software-defined data center (SDDC) solution that will be used to deliver a private cloud service for a customer.

During the initial meeting with the service owner and business sponsor, the customer has provided the following information to help inform the design:

  • The solution must initially support the concurrent running of 300 production and 600 development virtual machines.
  • The production environment should be delivered across two geographically dispersed data centers. The development environment must be vSphere-based but does not have to be deployed on-premises.
  • The two data centers are connected to each other through multiple diversely routed, high bandwidth and low latency links.
  • The customer’s server hardware standard document states that all virtual infrastructure hosts must be based on blade architecture only.
  • The service owner has said that is important to ensure that neither the availability target of 99.5% nor the resource capacity is affected when the operations team completes maintenance activities, such as the monthly software patching and ad-hoc hardware break/fix.
  • All virtual machine backups must be completed using the existing backup service. The recovery time objective (RTO) for the service is four hours.
  • The recovery point objective (RPO) of the service is 24 hours.

Given the information from the customer, which two would be classified as assumptions within the design? (Choose two.)

Options:

A.

The backup service will store data in a secure facility

B.

The backup service has sufficient capacity for the new requirements

C.

The customer will update their hardware standard to support rack mount servers

D.

All virtual machines will be deployed with the same resource profile for production and development

E.

The clusters will have a minimum redundancy of N+1

Buy Now
Question # 26

An architect is designing a VMware solution for a customer to meet the following requirements:

  • The solution must use investments in existing storage array that supports both block and file storage.
  • The solution must support the ability to migrate workloads between hosts within a cluster.
  • The solution must support resource management priorities.
  • The solution must support the ability to connect virtual machines directly to LUNs.
  • The solution should use existing 32G fabric infrastructure.
  • There is no budget for additional physical hardware.

Which design decision should the architect make to meet these requirements?

Options:

A.

The ESXi hosts will leverage Fibre Channel (FC).

B.

The ESXi hosts will leverage iSCSI.

C.

The ESXi hosts will leverage Fibre Channel over Ethernet (FCoE).

D.

The ESXi hosts will leverage NFS.

Buy Now
Question # 27

A customer provides the following list of requirements for their vSphere platform:

  • REQ01 The solution should utilize dual network connections to eliminate single points of failure.
  • REQ02 The solution should allow logs to be retained for a period of 30 days.
  • REQ03 All user access to the platform should be recorded for audit purposes.
  • REQ04 The solution should allow the management of multiple ESXi hosts.
  • REQ05 The solution should allow users to view the remote console of virtual machines.

Which two of the listed requirements would be classified as non-functional requirements? (Choose two.)

Options:

A.

The solution should utilize dual network connections to eliminate single points of failure

B.

The solution should allow the management of multiple ESXi hosts

C.

The solution should allow users to view the remote console of virtual machines

D.

All user access to the platform should be recorded for audit purposes

E.

The solution should allow logs to be retained for a period of 30 days

Buy Now
Question # 28

Application owners require support of a Microsoft Windows Server Failover Cluster (WSFC).

Their current environment consists of the following components:

  • vSphere 7.0 and vSAN 7.0
  • External array supporting NFS 3.0/4.1, Server Message Block (SMB) 2.1
  • 10 GbE storage connectivity for all devices

The solution architect is tasked with coming up with a solution to meet this requirement while utilizing their existing investments.

Which two recommendations could the architect make? (Choose two.)

Options:

A.

Use vSAN native support for WSFC

B.

Use NFS 4.1 shares for quorum and shared disk

C.

Use raw device mapping (RDM)

D.

Use the SMB 2.1 protocol for sharing disks

E.

Run WSFC on vSAN iSCSI Target Service

Buy Now
Question # 29

Refer to the exhibit.

During a requirements gathering workshop, a customer shares the following diagram regarding their availability service-level agreements (SLAs):

The customer states that there is no application level availability for legacy applications.

Which recommendation could the architect make to meet the customer’s high availability requirements for the legacy applications virtual machines?

Options:

A.

Enable vSphere HA and add a VM Override with VM Restart Priority set to Disabled

B.

Enable Fault Tolerance

C.

Achieve application availability with snapshots

D.

Enable vSphere HA and add a VM Override with VM Restart Priority set to Lowest

Buy Now
Exam Code: 3V0-21.21
Exam Name: Advanced Design VMware vSphere 7.x
Last Update: Jan 31, 2025
Questions: 88
3V0-21.21 pdf

3V0-21.21 PDF

$25.5  $84.99
3V0-21.21 Engine

3V0-21.21 Testing Engine

$28.5  $94.99
3V0-21.21 PDF + Engine

3V0-21.21 PDF + Testing Engine

$40.5  $134.99