Which two statements are true concerning the installation of Oracle Grid Infrastructure 19c Cluster? (Choose two.)
Which three resources are managed using global concurrency control in an Oracle 19c RAC multi-instance database? (Choose three.)
Examine the output of theasmcmdandsrvctlcommands:
Then you execute this command:
$ srvctl relocate asm -currentnode host03 -targetnode host02
Which three statements are true regarding the execution of this command based on the output shown? (Choose three.)
Which two statements are true about Transparent Application Continuity in Oracle RAC 19c? (Choose two.)
Which two methods exist for enabling the collection of additional resource debugging information for specific resources controlled by Oracle 19c Clusterware? (Choose two.)
Which three statements are true about the Global Resource Directory (GRD) in Oracle 19c RAC database and in Clustered ASM? (Choose three.)
Which statement describes the usage of Dynamic Service Fallback in Oracle RAC 19c?
Which three events occur when a node fails in an Oracle Clusterware 19c Cluster? (Choose three.)
Examine the output of this command:
TheACFSdisk group is a normal redundancy disk group with 5 GB of free space.
To increase the size of theACFSfile system, you execute this command as therootuser:
$ /sbin/acfsutil size +200M /u01/app/grid/acfsmount
Which two statements are true regarding the outcome of this command? (Choose two.)
You must deploy several Oracle 19c databases on an Oracle Grid Infrastructure Managed Cluster, and are required to have the ability to perform these actions without down time:
1. Apply a Grid Infrastructure interim patch.
2. Apply a Grid Infrastructure Patch Set Update (PSU).
3. Apply a database on-line patch.
4. Apply a Grid Infrastructure patchset.
5. Apply a database patchset.
6. Upgrade Grid Infrastructure from one release to another.
7. Upgrade databases from one release to another.
Your plan is to perform these tasks:
1. Install and configure Oracle Grid Infrastructure on a local file system.
2. Install Oracle Database software on an ACFS file system.
3. Create several RAC One Node databases.
Which of the seven requirements are met by your plan?