Winter Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: bigdisc65

1Y0-440 Exam Dumps - Citrix CCE-N Questions and Answers

Question # 24

Which business driver would motivate a Citrix Architect to use the full range of security features on the Citrix ADC to allow for the removal of third party firewalls, proxy devices and multiple URLs?

Options:

A.

Increase flexibility

B.

Improve end user experience

C.

Improve performance

D.

Enable mobile work styles

E.

Consolidate multiple point solutions

Buy Now
Question # 25

Scenario: Based on a discussion between a Citrix Architect and a team of Workspacelab members, the MPX Logical layout for Workspacelab has been created across three (3) sites.

They captured the following requirements during the design discussion held for a Citrix ADC design project:

  • All three (3) Workspacelab sites (DC NDR and DR) will have similar Citrix ADC configurations and design
  • Both external and internal Citrix ADC MPX appliances will have Global Server Load Balancing (GSLB) configured and deployed in Active/Passive mode
  • GSLB should resolve both A and AAA DNS queries.
  • In the GSLB deployment the NDR site will act as backup for the DC site, whereas the DR site will act as backup for the NDR site
  • When the external Citrix ADC replies to DNS traffic coming in through Cisco Firepower IPS the replies should be sent back through the same path
  • On the internal Citrix ADC. both front-end VIP and back-end SNIP will be part of the same subnet
  • USIP is configured on the DMZ Citrix ADC appliances
  • The external Citrix ADC will act as default gateway for back-end servers.
  • All three (3) sites (DC, NDR, and DR) will have two (2) links to the Internet from different service providers configured in Active/Standby mode

Which design decision must the architect make to meet the design requirements above?

Options:

A.

Mac Based Routing must be configured on the External Citrix ADC

B.

Interface 0/1 must be used for DNS traffic

C.

The SNIP of the external Citrix ADC must be configured as default gateway on the back-end servers

D.

ADNS service must be used with IPv6 address

E.

The SNIP of the internal Citrix ADC must be configured as the default gateway on the back-end servers.

Buy Now
Question # 26

What are three potential risks when examining the disaster recovery plan and implementation for a company? (Choose three)

Options:

A.

Supporting infrastructure for proposed environment is NOT included in disaster recovery implementation

B.

A disaster recovery plan exists but has never been tested

C.

A disaster recovery location does NOT exist.

D.

Users require mobile devices with continuous access

E.

Optimal Gateway Routing decisions are NOT understood

Buy Now
Question # 27

Scenario: A Citrix Architect has sent the following request to the NetScaler:

Which response would indicate the successful execution of the NITRO command?

Options:

A.

302

B.

201

C.

202

D.

200

Buy Now
Question # 28

Scenario: A Citrix Architect needs to assess an existing Citrix ADC configuration. The customer recently found that members of certain administrator groups were receiving permissions on the production Citrix ADC appliances that do NOT align with the designed security requirements. Click the Exhibit button to view the configured command policies for the production Citrix ADC deployment.

To align the command policy configuration with the security requirements of the organization, the__________for________________should change. (Choose the correct option to complete the sentence.)

Options:

A.

command spec; Item 6

B.

priority; Item 5

C.

command spec; Item 3

D.

action; Item 4

E.

priority; Item 2

F.

action; Item 1

Buy Now
Question # 29

Scenario: A Citrix Architect needs to design a new Citrix Gateway deployment. During the design discussions, the architect documents the key requirements about when to provide VPN access for incoming connections to the Citrix Gateway virtual server. Click the Exhibit button to view the requirements.

Which policy expression will meet these requirements?

Options:

A.

Option A

B.

Option B

C.

Option C

D.

Option D

E.

Option E

Buy Now
Question # 30

Scenario: A Citrix Architect and a team of Workspacelab members met to discuss a NetScaler design project. They captured the following requirements from this design discussion:

  • A pair of NetScaler MPX appliances will be deployed in the DMZ network.
  • High Availability will be accessible in the NetScaler MPX in the DMZ Network.
  • Load balancing should be performed for the internal network services like Microsoft Exchange Client Access Services and Microsoft App-V.
  • The load balancing should be performed for StoreFront.
  • The NetScaler Gateway virtual server will be utilizing the StoreFront load-balancing virtual server.
  • The NetScaler Gateway virtual server and StoreFront.
  • The NetScaler Gateway virtual service and StoreFront and load-balancing services are publicly accessible.
  • The traffic for internal and external services must be isolated.

Click the Exhibit button to review the logical network diagram.

Which two design decisions are incorrect based on these requirements? (Choose two.)

Options:

A.

LB StoreFront bound to traffic Domain 0

B.

Citrix Gateway VIP bound to Traffic Domain 1

C.

LB APP-V bound to Traffic Domain 1

D.

SNIP 192.168.20.2 bound to Traffic Domain 1

Buy Now
Question # 31

Scenario: A Citrix Architect is asked by management at the Workspacelab organization to review their existing configuration and make the necessary upgrades. The architect recommends small changes to the pre-existing Citrix ADC configuration. Currently, the Citrix ADC MPX devices are configured in a high availability pair, and the outbound traffic is load balanced between two Internet service providers (ISPs). However, the failover is NOT happening correctly. The following requirements were discussed during the design requirement phase:

• The return traffic for a specific flow should be routed through the same path while using Link Load Balancing.

• The link should fail over even if the ISP router is up and intermediary devices to an ISP router are down.

• Traffic going through one ISP router should fail over to the secondary ISP, and the traffic should NOT flow through both routers simultaneously. What should the architect configure to meet this requirement?

Options:

A.

Transparent monitor

B.

Ping Monitor

C.

HTTP-ECV monitor wit" secure option enabled

D.

HTTP-ECV monitor without secure option enabled

Buy Now
Question # 32

Scenario: The Workspacelab team has implemented a Citrix ADC high availability pair and Citrix ADC Management and Analytics (Citrix Application Delivery Management). The Citrix Application Delivery Management was configured by a Citrix Architect to monitor and manage these devices. The Workspacelab team wants to load balance their Microsoft SharePoint servers on the Citrix ADC and needs the process to be streamlined and administered using Citrix Application Delivery Management. The following requirements were discussed during the meeting.

• The Microsoft SharePoint server should be optimized. Load balanced, and secured in the network and should be deployed using Citrix Application Delivery Management.

• All the configurations should be verified before getting pushed to the Citrix Application Delivery Management.

What is a prerequisite for installing Microsoft SharePoint using Citrix Application Delivery Management?

Options:

A.

Citrix ADC needs to have a platinum license Installed on it

B.

Citrix Application Delivery Management should have a version higher than 12.0.53.13 nc

C.

Citrix ADC MPX should be of 11500 series

D.

Microsoft SharePoint version should be 2016

Buy Now
Question # 33

Scenario: The Workspacelab team has implemented Citrix ADC high availability pair and Citrix ADC Management and Analytics System (Citrix Application Delivery Management). The Citrix Application Delivery Management was configured by a Citrix Architect to monitor and manage these devices. The Workspacelab team wants to load balance their Microsoft SharePoint servers on the Citrix ADC and needs the process to be streamlined and administered using Citrix Application Delivery Management.

The following requirements were discussed during the meeting:

  • The Microsoft SharePoint server should be optimized, load balanced, and secured in the network and should be deployed using Citrix Application Delivery Management.
  • All the configurations should be yenned before getting pushed to the Citrix Application Delivery Management.

Which feature should the architect use to configure the Microsoft SharePoint server using Citrix Application Delivery Management?

Options:

A.

StyleBooks

B.

Orchestration

C.

Configuration

D.

Jobs Analytics

Buy Now
Exam Code: 1Y0-440
Exam Name: Architecting a Citrix Networking Solution
Last Update: Feb 5, 2025
Questions: 152
1Y0-440 pdf

1Y0-440 PDF

$29.75  $84.99
1Y0-440 Engine

1Y0-440 Testing Engine

$33.25  $94.99
1Y0-440 PDF + Engine

1Y0-440 PDF + Testing Engine

$47.25  $134.99