Question # 4

Consider a TAS that is going to bedeployed for the first time. The TAS requires share resources and run it its own test environment. The infrastructure for the TAS has been created along with maintenance procedures. It is very unlikely the TAS will be required to work in other target

Environments. There is a high-risk that when the TAS is deployed in its own test environment, a number of existing application will no longer work because of conflicts with the existing shared resources.

Which of the following activities would you expect tobe MOST effective at mitigating the risk associated with the first deployment of the TAS?

Options:

A.

Testing the TAS for application compatibility issues in the target environment

B.

Testing the TAS for its ability to be implemented in other target test environments.

C.

Testing the TAS for regressions due to optimization that fix non-functional issues.

D.

Testing the TAS for ITS ability to run a shared test environment

Buy Now
Question # 5

A defect in a SUT has been resolved and validated by an automated defect re-test in the current release of the software. This retest has now been added to the automated regression test suite.

Which statement BEST describes a reason why this defect could re-occur in future releases?

Options:

A.

Automated defect confirmation testing is not effective at confirming that the resolved defect will continue to work in future releases

B.

The configuration management process does not properly control the synchronization between software archives

C.

The automated regression test suite is not run consistently for future releases.

D.

The automated regression test suite has a narrower scope of functionality

Buy Now
Question # 6

Which of the following statement about the implementation of automated regression testing is FALSE?

Options:

A.

When automating regression tests, the structure of automated tests must always be thesame as the corresponding manual tests

B.

When automating regression tests, the corresponding manual tests should have already been executed to verify they operate correctly

C.

When automating regression tests, the initialization steps set the testpreconditions should be automated wherever possible

D.

When automating regression tests, consideration should be given to how much time would be saved by automation

Buy Now
Question # 7

You are executing the first test run of a test automation suite of 200 tests. All the relevant information related to the state of the SUT and to the automated test execution is stored in a small database. During the Automated test run you observe that the first 10 test pass, while an abnormal termination occurs when executing the 11thtest. This test does not complete its execution and the overall execution of the suite is aborted. An immediate analysis of the abnormal termination is expected to be time consuming and you have been asked to produce a detailed report of the execution results for the first test run, as soon as possible.

What is the MOST important FIRST step to be taken immediately afterthe abnormal occurred when executing the 11thtest?

Options:

A.

Re-run the test automation suite starting from the 12thtest

B.

Return the database to a consistent state that allows subsequent test to run

C.

Take a backup of the database in its current state. So It can be analyzed later

D.

Re-run the test automation suite starting from the 1sttest.

Buy Now
Question # 8

Consider a TAS that uses a keyword-driven framework. The SUT is a web application and there is a large set of keywords available for writingthe automated tests that relate to highly specific user actions linked directly to the GUI of the SUT. The automated test written with the keywords are statically analyzed by a custom tool which highlight’s repeated instances of identical sequence of keywords. The waiting mechanism implemented by the TAS for a webpage load is based on a synchronous sampling within a given timeout. The TAS allows checking a webpage load every seconds until a timeout value

Options:

A.

Changing the scripting approach to data-driven scripting

B.

Implementing keywords with a higher level of granularity

C.

Changing the wait mechanism to explicit hard-coded waits

D.

Establishing an error recovery process for TAS and SUT

Buy Now
Question # 9

You have been asked to determine a TAS for a new release of a SUT,test should be automated wherever. The new release will consist of 5 new interfaces and an amendment to 3 existing interfaces. The new and amended interface will be deliver incrementally in 3 sprints, each lasting 2 weeks.

What would be the BEST Test Automation Solution (TAS) design in this scenario?

Options:

A.

Automate tests at both Component and System Level. Only do this automation once every interface has been fully developed or amended and manual testing has completed successfully.

B.

Automate tests at one level only, System level. Use only the newly developed interfaces and do not create any customized interfaces/test hooks.

C.

Automate the tests at two levels, Component and System level. Create customized hooks at Component level for interface not yet developed or amended. Only use the newly developed or amended interfaces to test at System level.

D.

Automate a test at once level, component level, Create customized interface/test hooks for this level where the interface has not yet been developed or amended.

Buy Now
Exam Code: TAE
Exam Name: ISTQB Certified Tester Advanced Level-Test Automation Engineering
Last Update: Feb 23, 2025
Questions: 40
TAE pdf

TAE PDF

$25.5  $84.99
TAE Engine

TAE Testing Engine

$28.5  $94.99
TAE PDF + Engine

TAE PDF + Testing Engine

$40.5  $134.99