Special Summer Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: Board70

ICBB Exam Dumps - IASSC Lean Six Sigma Black Belt Questions and Answers

Question # 34

As a means of measuring the effects on other areas of a process as a result of changes in the primary metric we also define and track ________________.

Options:

A.

Parallel process metrics

B.

Secondary metrics

C.

Tertiary metrics

D.

Industry standards

Buy Now
Question # 35

A Lean Six Sigma project is attempting to reduce inventory days. The Process Capability will be monitored as part of the Control Phase to track the sustainability of the improvement.

Which distribution type is best used for performing the Capability Analysis?

Options:

A.

Weibull Distribution

B.

Normal Distribution

C.

Exponential Distribution

D.

Logistic Distribution

E.

Gaussian Distribution

Buy Now
Question # 36

Early in a project a Belt will want to begin to identify and evaluate risk factors for the subject process and will therefore begin building a(n) ______________.

Options:

A.

SIPOC

B.

FMEA

C.

Business Case

D.

Team charter

Buy Now
Question # 37

Fractional Factorial, ____________and Response Surface Method are types of planned experiments.

Options:

A.

Multi-Vari Analysis

B.

Baldridge Channels

C.

One Factor at a Time or OFAT

D.

Factorial Design

Buy Now
Question # 38

When a Belt creates a Process Map she will use a __________________ to depict a decision point requiring a Yes or No decision.

Options:

A.

Circle

B.

Square

C.

Diamond

D.

Rectangle

Buy Now
Question # 39

Six Sigma is a business improvement discipline whose fundamental view is based on a _________ oriented approach of the business.

Options:

A.

Profit

B.

Performance

C.

Process

D.

Predatory

Buy Now
Question # 40

Range Charts are the technique used to determine if ______________ are occurring within the subgroups of the SPC Charts.

Options:

A.

Common Causes

B.

Special inspections

C.

Unnatural forces

D.

Special Causes

Buy Now
Question # 41

A(n) ________________ has occurred when two inputs have a greater impact on a change in the output than either of the inputs has by itself.

Options:

A.

Dependency

B.

Bimodal reaction

C.

Interaction

D.

Amplified effect

Buy Now
Question # 42

From the variance F-test shown above, which of these conclusions is/are valid?

Options:

A.

The variance between the class score distribution is significantly different

B.

The variance between the class score distribution is not significantly different

C.

This test applies only to Normal Distributed data at 99 % confidence

D.

This test applies only to Non-normal Data at 99 % confidence

E.

There are not enough data points to make any statistical conclusions

Buy Now
Question # 43

What is the Ppk of a process with a spread of 24 units, an average of 68, an upper limit of 82 and a lower limit of 54?

Options:

A.

1.68

B.

2.00

C.

4.00

D.

4.42

Buy Now
Exam Code: ICBB
Exam Name: IASSC Lean Six Sigma - Black Belt
Last Update: Apr 2, 2025
Questions: 300
ICBB pdf

ICBB PDF

$25.5  $84.99
ICBB Engine

ICBB Testing Engine

$28.5  $94.99
ICBB PDF + Engine

ICBB PDF + Testing Engine

$40.5  $134.99