ICBB Exam Dumps - IASSC Lean Six Sigma Black Belt Questions and Answers

Question # 24

For a Kanban to be successful which of these must occur?

Options:

A.

Consistent cycle times

B.

Fairly stable process demand of product or service

C.

Low defect rate of incoming product or service

D.

All of the above

Buy Now
Question # 25

Which one of the listed tools is frequently used to help drill down to possible causes once a Fishbone Diagram is constructed?

Options:

A.

3 When Analysis

B.

Skeleton Diagnostic

C.

Ishikawa Diagram

D.

5 Why Analysis

Buy Now
Question # 26

A natural logarithmic base is not required for which of these distributions for probability calculations?

Options:

A.

Weibull

B.

Normal

C.

Poisson

D.

Binomial

Buy Now
Question # 27

What aspects of Measurement Systems Analysis (MSA) studies are applicable when the process used to measure does not damage the part?

Options:

A.

Destructive variable gage R&R and Crossed Study

B.

Destructive variable gage R&R and Nested Study

C.

Nondestructive variable gage R&R and Crossed Study

D.

Nondestructive variable gage R&R and Nested Study

Buy Now
Question # 28

The distance between the Mean of a data set and the Point of Inflection on a Normal curve is called the _______________.

Options:

A.

Curve Spread

B.

Standard Deviation

C.

Numerical Average

D.

Data Breadth

Buy Now
Question # 29

A fundamental rule is that both Standard Deviation and Variance can be added.

Options:

A.

True

B.

False

Buy Now
Question # 30

Which of these graphical presentations displays the values of each individual reading?

Options:

A.

Histogram

B.

Box Plot

C.

Stem and Leaf Plot

D.

X-Y Diagram

Buy Now
Question # 31

A valuable tool to use during the Measure Phase to show material and information flow throughout an entire process is the ______________ .

Options:

A.

Value Stream Map

B.

FMEA

C.

Pareto Chart

D.

Standard Operating Procedure

Buy Now
Question # 32

A(n) ______________ is best used to compare a Machine 1 average quality characteristic to the same quality characteristic of Machine 2.

Options:

A.

1-Sample t-test

B.

2-Sample t-test

C.

F test

D.

ANOVA test

Buy Now
Question # 33

Following the completion of a LSS project the Belt not only creates a Control Plan he also develops a _____________ so those involved in the process know what to do when the critical metrics move out of spec.

Options:

A.

Response Plan

B.

Call List

C.

Chain-of-Command

D.

Defect Analysis Plan

Buy Now
Exam Code: ICBB
Exam Name: IASSC Lean Six Sigma - Black Belt
Last Update: Apr 2, 2025
Questions: 300
ICBB pdf

ICBB PDF

$25.5  $84.99
ICBB Engine

ICBB Testing Engine

$28.5  $94.99
ICBB PDF + Engine

ICBB PDF + Testing Engine

$40.5  $134.99