Due to an unexpected power outage, Site A is completely down. The disaster recovery strategy was implemented (see diagram). What is the correct way to start replicated VMs on Site B, while ensuring you can failback after Site A comes back online?
Which of the following are valid export options for Microsoft SQL Server items when using the Veeam Explorer for Microsoft SQL? (Choose two.)
Veeam ONE has been installed and configured. The infrastructure contains five Veeam Backup & Replication servers.
The administrator needs to check the remaining capacity on each of the backup repository servers. Where can they see this information?
15 VMs are running on a Hyper-V platform and five physical servers at a remote office (ROBO). The administrator has been tasked with setting up centralized off-site backups at the headquarters (HQ). The available bandwidth is 50 Mbps. RPO is set to six hours and the data generated for the interval is 500 GB. WAN accelerators can be added if necessary. Which of the following will achieve the RPO?