Winter Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: bigdisc65

Veeam VMCE_v12 Based on Real Exam Environment

Page: 2 / 7
Question 8

For which workload can Veeam Data Platform achieve image-level backups?

Options:

A.

AS/400

B.

Solaris

C.

IOS

D.

IHP-UX

Question 9

What is a Recovery Point Objective (RPO) in regards to disaster recovery?

Options:

A.

The number of recovery points created during the backup process

B.

The acceptable data loss measured in time that can be tolerated

C.

The maximum amount of time it takes to restore a system

D.

The total cost associated with recovering a system

Question 10

A planned failover of three VMs has just completed successfully, starting the VMs at the disaster recovery location. What next actions are available for the failover plan?

Options:

A.

Undo, Start, Edit, Delete

B.

Undo, Start, Copy, Delete

C.

Cancel. Start, Edit, Delete

D.

Cancel, Start, Copy, Delete

Question 11

What is the purpose of a Cache Repository when adding the file share?

Options:

A.

To walk the file shares and move data to the backup repository

B.

To control how fast the backup proxy can read data from the source file share

C.

To make sure backup retention is being managed correctly

D.

To store temporary metadata and track all objects that have changed

Page: 2 / 7
Exam Code: VMCE_v12
Exam Name: Veeam Certified Engineer v12
Last Update: Nov 21, 2024
Questions: 109
VMCE_v12 pdf

VMCE_v12 PDF

$28  $80
VMCE_v12 Engine

VMCE_v12 Testing Engine

$33.25  $95
VMCE_v12 PDF + Engine

VMCE_v12 PDF + Testing Engine

$45.5  $130