Explanation: A feasibility assessment is a process of evaluating the viability and suitability of moving an on-premises application to the cloud. A feasibility assessment can help identify the benefits, risks, costs, and challenges of cloud migration, as well as the technical and business requirements, constraints, and dependencies of the application. A feasibility assessment can also help compare different cloud service models, deployment models, and providers, and recommend the best option for the application. A feasibility assessment would be the best way to review the options for moving a business-critical application to the cloud.
A gap analysis is a process of identifying the differences between the current and desired state of a system or process. A gap analysis can help determine the gaps in performance, functionality, security, or compliance of an on-premises application and a cloud-based application, and suggest the actions needed to close the gaps. A gap analysis is usually performed after a feasibility assessment, when the cloud migration option has been selected, and before the transition planning phase.
A test is a process of verifying the functionality, performance, security, or compatibility of an application or system. A test can help detect and resolve any errors, bugs, or issues in the application or system, and ensure that it meets the expected standards and specifications. A test can be performed in a sandbox environment, which is an isolated and controlled environment that mimics the real production environment. A test is usually performed during or after the cloud migration process, when the application has been deployed or migrated to the cloud, and before the final release or launch.
A high-level architecture is a conceptual or logical design of an application or system that shows the main components, functions, relationships, and interactions of the application or system. A high-level architecture can help visualize and communicate the structure, behavior, and goals of the application or system, and guide the development and implementation process. A high-level architecture is usually created during the design phase of the cloud migration process, after the feasibility assessment and the gap analysis, and before the development and testing phase. References: CompTIA Cloud Essentials+ CLO-002 Study Guide, page 109-110, 113-114, 117-118, 121-122; CompTIA Cloud Essentials+ Certification Training, CertMaster Learn for Cloud Essentials+, Module 3: Cloud Solutions, Lesson 3.2: Cloud Migration, Topic 3.2.1: Cloud Migration Process