Pearson API-580 New Attempt

Page: 2 / 5
Question 8

A process to assess risks, to determine if risk reduction is required and to develop a plan to maintain risks at an acceptable level

Options:

A.

Risk management

B.

Risk mitigation

C.

Risk control

Question 9

Reliability efforts, such as reliability centered maintenance (rcm), can be linked with rbi, resulting in an integrated program to

Options:

A.

Reducedowntime in an operating unit

B.

Reduce operating time of a unit

C.

To reduce risk by mitigation activities

Question 10

Process used to compare the estimated risk against given risk criteria to determine the significance of the risk.

Options:

A.

Risk evaluation

B.

Risk estimation

C.

Risk identification

Question 11

The type of failure mode that likely to occur due thinning

Options:

A.

Larger leaks or rupture

B.

Only rupture

C.

Metal loss

D.

Cracks

Page: 2 / 5
Exam Code: API-580
Exam Name: Risk Based Inspection Professional
Last Update: Nov 1, 2024
Questions: 140