Black Friday Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: Board70

PDF D-XTR-DY-A-24 Study Guide

Page: 4 / 4
Question 16

A systems administrator upgraded a Microsoft Windows 2003 server to Windows Server 2008. The administrator noticed that performance is less than expected. Investigation has shown that the partitions on the XtremlO volumes are misaligned.

Which step(s) should be taken to align the data?

Options:

A.

Backup the data, run diskpart, recreate the partition, restore the data

B.

Use Disk Management to move the partition

C.

Backup the data, run fdisk, recreate the partition, restore the data

D.

Use Mbralign to move the partition

Question 17

A company requires hourly snapshots to be taken from a set of 15 volumes. Assuming no other volumes or snapshots exist, approximately how long can an XtremIO X1 array

continue to fulfill this request until the system maximum is reached?

Options:

A.

497 hours

B.

512 hours

C.

8177 hours

D.

256 hours

Question 18

Based on the XtremIO X1 Storage Array Software Installation and Upgrade Guide, what is the correct sequence of installation steps?

Options:

Page: 4 / 4
Exam Code: D-XTR-DY-A-24
Exam Name: Dell XtremIO Deploy Achievement
Last Update: Nov 24, 2024
Questions: 63
D-XTR-DY-A-24 pdf

D-XTR-DY-A-24 PDF

$25.5  $84.99
D-XTR-DY-A-24 Engine

D-XTR-DY-A-24 Testing Engine

$28.5  $94.99
D-XTR-DY-A-24 PDF + Engine

D-XTR-DY-A-24 PDF + Testing Engine

$40.5  $134.99