Question 8

When the Inputs, X’s, for your process are Normally Distributed about the Mean, the Outputs, Y’s, will be Normally Distributed.

Options:

A.

True

B.

False

Question 9

A Full Factorial experiment using a 2 level 4 factor approach has been proposed to test the viability of an extrusion machine experiment. How many treatment combinations will this approach involve?

Options:

A.

8

B.

16

C.

32

D.

64

Question 10

Upon completion and validation of an improvement to a process a Belt and the Project Team create a Control Plan that contains which of these?

Options:

A.

Standard operating work description of the process change

B.

Description of the monitoring system in place to assure continued compliance

C.

Summary of the targeted critical metrics for process performance measurement

D.

All of the above

Question 11

Appropriate measures means that measurements are ______________.

Options:

A.

Representative

B.

Sufficient

C.

Contextual

D.

Relevant

E.

All of these answers are correct

Page: 2 / 11
Exam Code: CSSBB
Exam Name: Six Sigma Black Belt Certification
Last Update: Dec 27, 2024
Questions: 227
CSSBB pdf

CSSBB PDF

$25.5  $84.99
CSSBB Engine

CSSBB Testing Engine

$28.5  $94.99
CSSBB PDF + Engine

CSSBB PDF + Testing Engine

$40.5  $134.99