A recent power Outage caused email services to go down. A sever administrator also received alerts from the datacenter’s UPS.
After some investigation, the server administrator learned that each POU was rated at a maximum Of 12A.
INSTRUCTIONS
Ensure power redundancy is implemented throughout each rack and UPS alarms are resolved. Ensure the maximum potential PDU consumption does not exceed 80% or 9.6A).
a. PDU selections must be changed using the pencil icon.
b. VM Hosts 1 and 2 and Mail Relay can be moved between racks.
c. Certain devices contain additional details
A server administrator added a new drive to a server. However, the drive is not showing up as available. Which of the following does the administrator need to do to make the drive available?
A server administrator is completing an OS installation for a new server. The administrator patches the server with the latest vendor-suggested software, configures DHCP, and verifies all network cables are properly connected in the IDF, but there is no network connectivity. Which of the following is the MOST likely reason for the lack of connectivity?
Which of the following open ports should be closed to secure the server properly? (Choose two.)