Winter Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: bigdisc65

New Release PSM-I Professional Scrum Master Questions

Page: 12 / 18
Question 48

Who has the final decision about the order of items in the Product Backlog? (Choose the best answer.)

Options:

A.

The Stakeholders.

B.

The Product Owner.

C.

The Scrum Team.

D.

The Scrum Master.

E.

The Developers.

Question 49

A Scrum Team is only allowed to meet with stakeholders during Sprint Review.

Options:

A.

True

B.

False

Question 50

During a Sprint Retrospective, for what is the Product Owner responsible?

Options:

A.

Participating as a Scrum Team member.

B.

Summarizing and reporting the discussions to the stakeholders that he/she represents in the Scrum Team.

C.

Capturing requirements for the Product Backlog.

D.

The Product Owner should not take part in Sprint Retrospectives.

Question 51

Which topics should be discussed in the Sprint Review? (Choose the best answer.)

Options:

A.

The Scrum process, and how it was used during the Sprint.

B.

Coding and engineering practices.

C.

The product Increment.

D.

All of the above.

Page: 12 / 18
Exam Code: PSM-I
Exam Name: Professional Scrum Master I
Last Update: Nov 21, 2024
Questions: 250
PSM-I pdf

PSM-I PDF

$28  $80
PSM-I Engine

PSM-I Testing Engine

$33.25  $95
PSM-I PDF + Engine

PSM-I PDF + Testing Engine

$45.5  $130