Black Friday Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: Board70

New Release 1z0-1066-24 Supply Chain Planning Cloud Questions

Page: 7 / 9
Question 28

What does the Advanced Plan Option check box "Consider currency conversion rates to plan revenue" do?

Options:

A.

It enables backlog plans to prioritize constrained products based on higher price and to consider exchange rates.

B.

For supply and sales and operations plans, it enables prioritization of constrained products based on higher price and to consider exchange rates.

C.

It enables supply plans with planning method constrained to prioritize constrained products based on higher price and to consider exchange rates.

D.

It enables sales and operations plans with constrained products to prioritize products based on higher price and to consider exchange rates.

Question 29

Your client wants to exclude all of the inventory from the 'Reject' subinventory from only one of their supply plans. What action must be taken to meet this requirement?

Options:

A.

Manage Plans > Search and select supply plans > 'Organizations and Schedules' tab > 'Organizations' > 'Subinventory Netting' > Deselect 'Reject' subinventory for each organization

B.

Manage Subinventories > Search and select subinventory > Deselect 'Nettable'

C.

It is not possible to exclude one subinventory from a particular supply plan.

D.

Manage Plans > Search and select supply plans > 'Organizations and Schedules' tab > 'Supply Schedules' > 'Subinventory Netting' > Deselect 'Reject' subinventory for each organization

E.

Manage Subinventories > Choose a material status in which 'Nettable' is unchecked

Question 30

Planner 1 works in Europe and needs to see three measures in kilograms (the default UOM). Planner 2 is US-based and needs to see those same three measures in pounds. Both planners need to use five tables in their plan analyses on a regular basis. At the moment, all five tables are displayed in kilograms.

Which two options would most efficiently address this requirement?

Options:

A.

Create duplicates of the three measures in Manage Planning Measures and change each new measure's UOM from kilograms to pounds, then duplicate the five tables but use the new measures.

B.

There is no efficient solution to this requirement.

C.

Open each table and format measures to duplicate the three measures and then format the duplicated measures to be displayed in pounds.

D.

Planner 2 opens a table, formats each measure to be displayed in pounds. When Planner 1 opens the same table, they reformat back to be displayed in kilograms.

E.

Duplicate all five tables, then format the three measures in the copied tables to be displayed in pounds.

Question 31

During implementation, the customer would like to use safety stock planning parameters. However, they would like to uncheck "Safety stock change interval to all items." What will the results be if they choose to uncheck this parameter?

Options:

A.

Safety stock will not be calculated at all for this plan.

B.

This option will require a min/max quantity for this parameter even though it will not be used.

C.

Safety stock will use a smoothing method to calculate the safety stock within change interval to determine the level of safety stock needed without this parameter.

D.

Safety stock change interval will only apply to items with Days of Cover safety stock method.

Page: 7 / 9
Exam Code: 1z0-1066-24
Exam Name: Oracle Planning and Collaboration Cloud 2024 Implementation Professional
Last Update: Nov 23, 2024
Questions: 134
1z0-1066-24 pdf

1z0-1066-24 PDF

$25.5  $84.99
1z0-1066-24 Engine

1z0-1066-24 Testing Engine

$28.5  $94.99
1z0-1066-24 PDF + Engine

1z0-1066-24 PDF + Testing Engine

$40.5  $134.99